| 12/03/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE HAS BEEN STABILIZED.
2) FILE YOUR NOTICE OF TERMINATION WITH ADEQ |
| 11/12/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 11/07/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 11/04/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE CHANGES MADE TO EROSION PROTECTION FOR THE PERIMETER SLOPE ALONG THE SOUTH SIDE OF THE SITE ARE SHOWN IN AN AS-BUILT DRAWING.
2) INSTALL RAILING ALONG PEDESTRIAN ACCESS RAMP AT WEST SIDEWALK AND STAIRS.
3) TRASH ENCLOSURE CONSTRUCTION DOES NOT MEET THE DEV. STD 6-0.10 HOWEVER IT WAS APPROVED BY THE ENGINEERING REVIEWER LAUREN MAKUS.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 10/28/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS |
| 10/25/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR CATCH BASIN AND ADJACENT 12" CMP. OK TO POUR BOTTOM OF BASIN. WILL RE-INSPECT
2) MEASURED SLOPE OF PEDESTRIAN ACCESS OFF OF 1ST AVE. SLOPE IS >5%. CONTRACTOR MUST REDUCE SLOPE FOR ACCESS WAY OR COMPLY WITH ADA REQUIREMENTS FOR A RAMP.
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 09/26/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
| 07/15/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME |
| 07/11/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR IS STILL WORKING ON THE BLDG, NO SIGNIFICANT SITE WORK AT THIS TIME.
2) NO STORM WATER CONCERNS AT THIS TIME |
| 06/26/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 06/07/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME |
| 05/22/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SITE NEEDS A RETAINING WALL ALONG THE SOUTH PERIMETER. GRADE DIFFERENTIAL IS GREATER THAN 4 FEET
2) SOME SITE WORK COMPLETED
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 05/13/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES |
| 05/03/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME
NO ACTIVITY ON SITE |
| 04/25/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY ON SITE. MAY NEED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS ALONG THE SOUTH SIDE
|
| 04/16/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - MINIMAL SITE WORK, NO SIGNIFICANT CHANGES
NO STORM WATER CONCERNS AT THIS TIME |
| 03/27/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ADD BOLLARDS TO EACH SIDE OF TRASH ENCLOSURE
2) ENSURE 10' INSIDE CLEAR WIDTH OF ENCLOSURE FOR CONTAINER PER THE DEV. STD.
3) REBAR LAY-OUT OK FOR TRASH ENCLOSURE WALLS.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
5) CONTRACTOR WORKING ON WALLS OF BLDG |
| 02/25/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME |
| 02/06/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 01/29/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - OFF AND ON RAIN SHOWERS, NO ACTIVITY ON SITE.
CONTRACTOR WORKING ON FOOTING FOR A RETAINING WALL.
SOME PERIMETER SEDIMENT CONTROLS IN PLACE
NO STORM WATER CONCERNS AT THIS TIME |
| 01/11/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 12/20/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY ON SITE, NO CHANGES.
NEED TO ADD SEDIMENT CONTROLS TO SE CORNER OF SITE |
| 12/14/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - SOME UTILITY WORK BEING DONE.
PERIMETER SEDIMENT CONTROLS IN PLACE
NO SIGNIFICANT CONCERNS AND/OR PROBLEMS AT THIS TIME. |
| 12/07/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO ACTIVITY ON THE SITE, HOWEVER THE SITE HAS BEEN ROUGH GRADED AND UTILITY WORK IS BEING DONE.
THE SITE DOES NOT HAVE A SWPPPP HOWEVER SOME SEDIEMNT CONTROLS HAVE BEEN INSTALLED |