Date Description Inspector Results Comments
10/23/2014 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/23/2014 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
12/03/2013 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
10/25/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - AN APPROVED REVISION ON SITE.
12/03/2013 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 - 1) AWAITING FINAL GRADING INPECTION REQUEST 2) NEED AS-BUILT DRAWING SHOWING CHANGES MADE TO THE SITE/GRADING PLAN 3) AWAITING FOR A CERT STATEMENT FROM THE ENG OF RECORD. 4) COMPLETE ALL SITE/GRADING/LANDSCAPING PER APPROVED PLAN
11/12/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME
11/07/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS
11/04/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) ENSURE CHANGES MADE TO EROSION PROTECTION FOR THE PERIMETER SLOPE ALONG THE SOUTH SIDE OF THE SITE ARE SHOWN IN AN AS-BUILT DRAWING. 2) INSTALL RAILING ALONG PEDESTRIAN ACCESS RAMP AT WEST SIDEWALK AND STAIRS. 3) TRASH ENCLOSURE CONSTRUCTION DOES NOT MEET THE DEV. STD 6-0.10 HOWEVER IT WAS APPROVED BY THE ENGINEERING REVIEWER LAUREN MAKUS. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
10/28/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - CATCH BASIN PER PLANS
10/25/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR CATCH BASIN AND ADJACENT 12" CMP. OK TO POUR BOTTOM OF BASIN. WILL RE-INSPECT 2) MEASURED SLOPE OF PEDESTRIAN ACCESS OFF OF 1ST AVE. SLOPE IS >5%. CONTRACTOR MUST REDUCE SLOPE FOR ACCESS WAY OR COMPLY WITH ADA REQUIREMENTS FOR A RAMP. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4) ENSURE SLOPE STABILIZATION ALONG THE SOUTH SIDE OF THE SITE IS COMPLETED PER PLAN.
09/26/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - CONTRACTOR STARTING TO DO SITE WORK, NO SIGNIFICANT CONCERNS AT THIS TIME
07/15/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME
07/11/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR IS STILL WORKING ON THE BLDG, NO SIGNIFICANT SITE WORK AT THIS TIME. 2) NO STORM WATER CONCERNS AT THIS TIME
06/26/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE WORK BEING DONE AT THIS TIME
06/07/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE WORK CHANGES AND/OR CONCERNS AT THIS TIME
05/22/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) SITE NEEDS A RETAINING WALL ALONG THE SOUTH PERIMETER. GRADE DIFFERENTIAL IS GREATER THAN 4 FEET 2) SOME SITE WORK COMPLETED 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
05/03/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME NO ACTIVITY ON SITE
04/16/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - MINIMAL SITE WORK, NO SIGNIFICANT CHANGES NO STORM WATER CONCERNS AT THIS TIME
03/27/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) ADD BOLLARDS TO EACH SIDE OF TRASH ENCLOSURE 2) ENSURE 10' INSIDE CLEAR WIDTH OF ENCLOSURE FOR CONTAINER PER THE DEV. STD. 3) REBAR LAY-OUT OK FOR TRASH ENCLOSURE WALLS. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 5) CONTRACTOR WORKING ON WALLS OF BLDG
03/19/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
03/08/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES WITH THE SITE ENSURE SLOPE ALONG SOUTH SIDE IS STABILIZED
02/25/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME
02/22/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - RAIN AND SNOW THE DAY BEFORE NO ACTIVITY. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/06/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
01/29/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - OFF AND ON RAIN SHOWERS, NO ACTIVITY ON SITE. CONTRACTOR WORKING ON FOOTING FOR A RETAINING WALL. SOME PERIMETER SEDIMENT CONTROLS IN PLACE NO STORM WATER CONCERNS AT THIS TIME
01/11/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
12/20/2012 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO ACTIVITY ON SITE, NO CHANGES. NEED TO ADD SEDIMENT CONTROLS TO SE CORNER OF SITE
12/14/2012 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - SOME UTILITY WORK BEING DONE. PERIMETER SEDIMENT CONTROLS IN PLACE NO SIGNIFICANT CONCERNS AND/OR PROBLEMS AT THIS TIME.
12/07/2012 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO ACTIVITY ON THE SITE, HOWEVER THE SITE HAS BEEN ROUGH GRADED AND UTILITY WORK IS BEING DONE. THE SITE DOES NOT HAVE A SWPPPP HOWEVER SOME SEDIEMNT CONTROLS HAVE BEEN INSTALLED