Permit: DP12-0085
Permit Details
Status:
Complete
Type:
Development Package
Address:
7540 S OLD VAIL RD
Address NEW:
7540 S OLD VAIL RD
Apply Date:
06/06/2012
Applicant:
Description:
PRAIRIE FIRE
Permit Reviews
Permit Number - DP12-0085
Permit Status: Complete
Permit Description: PRAIRIE FIRE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2012 | DEV PKG - OK TO SUBMIT | 06/06/2012 | COMPLETED |
| 06/06/2012 | DEV PKG | 07/23/2012 | COMPLETED |
| 07/27/2012 | DEV PKG - RESUBMITTAL | 08/13/2012 | COMPLETED |
| 08/13/2012 | DEV PKG - RESUBMITTAL | 08/17/2012 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP12-0085
Permit Status: Complete
Permit Description: PRAIRIE FIRE
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/13/2012 | 4)For Basis of Elevation, use Southeast property corner as noted on plans. |
| 08/13/2012 | 5)Basin is required to have erosion protection for unattenuated flow conditions. For Civil Construction Details sheet 3/21, to clarify for Detention Basin Cross Section, rip rap with filter fabric shall be provided on all sides of the basin, to 100-yr WSEL plus freeboard is needed to direct flows to weir.6)Provision and participation in the improvement district for maintaining public infrastructure is also referenced in the Annexation (Ord.6143). 7)Call for PDSD Engineering inspection of basin construction improvements, and any areas as identified by the Inspectors. Inspections should also include PDSD engineering inspection at time of installation of basin stormdrain pipe for basin. Discuss during Pre-con or contact PDSD Engineering Inspector to confirm which inspections may be needed. 8)During construction activities, traffic control plans may be required if there is a safety hazard potential from construction activities conflicting with public traffic. It may be necessary to submit a copy of a traffic control plan to PDSD Engineering. Traffic control plans shall minimize traffic hazard conditions between public access to existing buildings, and construction vehicles & activities.9)Additional drainage pipes may be needed for the site as deemed necessary by the EOR or identified during construction.10)A copy of stamped approved plan(s), floodplain use permit, NOI, AzPDES general permit, geotechnical report/addenda, and other reports shall be kept at site at all times, until final grading approval. |
| 08/13/2012 | 11)Grading / Disturbance Limits shall be maintained and no disturbance outside of grading limits will be allowed. Stop Work Order may be issued if disturbance occurs outside of approved grading limits as shown on approved plans. There shall be no disturbance, construction vehicle traffic or parking, or stockpiling outside of approved Grading Limits as shown on plans, and there shall be no disturbance of W.A.S.H. Ordinance areas as shown on approved plans. Any disturbance without authorization may result in Stop Work Order and/or other penalties.12)Interim erosion and sediment controls shall be maintained per approved plans along downstream areas of disturbance limits. Interim control measures shall be placed within approved grading limits. Prior to Final Approval all temporary controls shall be removed and permanent controls shall be placed.13)Stabilized entrances shall be maintained in area of all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.14)Storage or placement of construction material, vehicle staging / stockpile area, and/or designated concrete washout locations shall not be located within or near new basin or Regional Basin to the south, existing public drainageway, floodplain areas, or water harvesting areas. Temporary stockpiles shall not be located on easements or adjacent to existing public drainageway. 15)To keep construction debris from entering Regional Basin, heavy duty construction fencing along south project area may need to be provided as needed and as determined with consultation between contractor, engineer, and inspector. |
| 08/13/2012 | 16)Any revisions to Development Package plan sheets must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised plan. Call PDSD Engineering at 791-5550 to discuss any revisions.17)If grading construction is expected to last longer than expiration date of Development Package permit, contact PDSD to renew/extend the permits. If Final Grading Inspection has not been completed before Development Package Permit or Floodplain Use Permit expires, and permit(s) has not been renewed, additional fees and reviews may be required. Requests for permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to Floodplain Use Permit or Development Package Permit expiration dates, for consideration of plan extension approval.18)City of Tucson grading standards to DS Sec.11-01 apply. 19)For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or the NOI at construction entrance of site, at beginning of construction activities, and maintain this posted document throughout project construction.20)Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours:Arizona Department of Environmental Quality1110 W. Washington, 5th floor (5515B-1)Phoenix, AZ 85007Office: 602-771-4466; Fax 602-771-450521)Receiving waters are two watercourses: to the south is the Rita Ranch Regional Detention Basin, a tributary to the Julian Wash, and to the north is a tributary to the Pima Air Museum Wash.22)Signatures from Operators must be on site copy of SWPPP (exhibit or report) at or before commencement of construction. All Operators shall be identified and have separate certification statements. Assure these certifications are available on-site at Pre-con.23)Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with approved plans and permits, and all conditions of permit are completed. 24)After interim controls are removed, permanent erosion controls are required on all disturbed areas, in form of vegetative cover, gravel, and/or other approved controls. |
| 08/13/2012 | 25)As-builts are required to be submitted under activity number DP12-0085 to PDSD permit clerks. They will be reviewed and then if acceptable, a copy will be provided to PDSD Engineering Inspector for final grading inspections. For Development Package Permit Project Closure documentation, submit: one copy of original plans, 2 copies of as-builts, letters of substantial completion (one for overall project completion, and another for onsite drainage improvements including basin). As-built data shall include: all access, drainage, and maintenance easements labeled with sequence numbers, any finished pad elevation for buildings, inverts for inlets and outlets of drainage pipes/systems, basin area, and general grades as determined by RLS to show substantial completion for project. |
Conditions
Permit Number - DP12-0085
Permit Status: Complete
Permit Description: PRAIRIE FIRE
| Date | Description | Comments |
|---|---|---|
| 08/13/2012 | The following conditions apply to the Development Package DP12-0085 and Floodplain Use Permit T12OT01185:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Project is for improvements for Prairie Fire, a TEP SOLON Solar development, including grading, construction of 4.5 MW photovoltaic solar panel site, with drainage facilities and access improvements as shown on the approved plan entitled TEP Prairie Fire Solar sealed by James C. Campbell, P.E. dated 8-9-12 and Floodplain Use Permit based on Drainage Report TEP Prairie Fire Solar Project, revised July 16, 2012, sealed by James C. Campbell, P.E. dated 7-20-2012. 3)See other associated permits for Development Package DP12-0085 for this project: Floodplain Use Permit T12OT01185. |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0085
Permit Description: PRAIRIE FIRE
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2012 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/24/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NEW CONSTRUCTION. SITE HAS AN APPROVED STORM WATER PLAN AND PERMIT. DUE TO SITE SPECIFICS AN ENGINEERED "V" DITCH MAY BE USED ALONG THE PERIMETER AS A SEDIMENT CONTROL. 2) INSTALLATION OF YOUR SEDIMENT CONTROLS WILL BE INSPECTED AND APPROVED BY THE CITY OF TUCSON. 3) ENSURE A STABILIZED ENTRANCE/EXIT IS USED. 4) POSTA A COPY OF YOUR NOI/AUTHORIZATION NUMBER ON SITE. 5) SWEEP UP ANY TRACKING OF SOIL OFF ADJACENT ROADWAYS AS NEEDED. 6) DOCUMENT ANY CHANGES TO YOUR SWPPP AND DOCUMENT YOUR SELF INSPECTIONS.} |
|
| 08/31/2012 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/31/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) AN ENGINEERED "V" DITCH HAS BEEN INSTALLED ALONG THE PERIMETER OF THE SITE, AND WILL BE USED AS A BMP FOR SEDIMENT CONTROL. 2) ENSURE THE DITCH IS PROPERLY MAINTAINED AS NEEDED. 3) NO STABILIZED (ROCK) ENTRANCE/EXIT MAY BE NEEDED DUE TO THE LOCATION OF THE SITE. I WILL RE-EVALUATE DURING CONSTRUCTION. 4) ENSURE ALL CHANGES TO THE SWPPP AND SELF INSPECTIONS ARE DOCUMENTED.} ; {Activity date: 08/28/2012; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR ROUGH GRADDING THE SITE . NO STORM WATER CONTROLS HAVE BEEN INSTALLED AS OF YET. WILL RE- INSPECT TOMORROW FOR INSTALLATION.} |
|
| 10/19/2012 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF THE SITE IS COMPLETE 2) SOME WORK BEING DONE ON RET/DET BASINS, ENSURE ROCK RIP RAP AND TOE DOWNS ARE INSTALLED PROPERLY. 3) SITE IS MOSTLY STABILIZED. ENSURE NOT IS FILED WITH THE STATE OF AZ 4) PROVIDE A CERT STATEMENT FROM YOUR ENG OF RECORD 5) SUBMIT AS-BUILT DRAWING AT FINAL } ; {Activity date: 09/21/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SILT FENCE IS IN PLACE ALONG LOW POINTS OF THE PERIMETER OF THE SITE. 2) A CONSTRUCTED BIRM HAS BEEN INSTALLED ALONG OTHER AREAS OF THE BOUNDRY TO THE SITE. 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 4) CONTRACTOR INSTALLING BASES TO SOLAR PANELS AT VARIOUS INTERVALS. 5) A RET/DET BASIN HAS BEEN ROUGHED IN PER THE APPROVED PLAN. NO OTHER CONCERNS AT THIS TIME} ; {Activity date: 09/19/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/11/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/05/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME.} ; {Activity date: 08/31/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) AN ENGINEERED "V" DITCH HAS BEEN INSTALLED ALONG THE PERIMETER OF THE SITE, AND WILL BE USED AS A BMP FOR SEDIMENT CONTROL. 2) ENSURE THE DITCH IS PROPERLY MAINTAINED AS NEEDED. 3) NO STABILIZED (ROCK) ENTRANCE/EXIT MAY BE NEEDED DUE TO THE LOCATION OF THE SITE. I WILL RE-EVALUATE DURING CONSTRUCTION. 4) ENSURE ALL CHANGES TO THE SWPPP AND SELF INSPECTIONS ARE DOCUMENTED.} ; {Activity date: 08/28/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR ROUGH GRADDING THE SITE . NO STORM WATER CONTROLS HAVE BEEN INSTALLED AS OF YET. WILL RE- INSPECT TOMORROW FOR INSTALLATION.} |
|
| 01/14/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/14/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE STABILIZED ,CONTRACTOR NEEDS TO FILE (NOT)} ; {Activity date: 10/19/2012; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF THE SITE IS COMPLETE 2) SOME WORK BEING DONE ON RET/DET BASINS, ENSURE ROCK RIP RAP AND TOE DOWNS ARE INSTALLED PROPERLY. 3) SITE IS MOSTLY STABILIZED. ENSURE NOT IS FILED WITH THE STATE OF AZ 4) PROVIDE A CERT STATEMENT FROM YOUR ENG OF RECORD 5) SUBMIT AS-BUILT DRAWING AT FINAL } |
|
| 03/14/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/14/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LANDSCAPE FINAL APPROVED. 2) NEED TO REMOVE ALL TEMP SEDIMENT CONTROLS 3) NEED TO PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE RET/DET BASIN WAS CONSTRUCTED PER THE APPROVED PLAN} ; {Activity date: 01/18/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF PLANTS HAVE NOT BEEN PLANTED, MOST OF THE GROUND COVER HAS BEEN INSTALLED.} ; {Activity date: 08/24/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NEW CONSTRUCTION. SITE HAS AN APPROVED STORM WATER PLAN AND PERMIT. DUE TO SITE SPECIFICS AN ENGINEERED "V" DITCH MAY BE USED ALONG THE PERIMETER AS A SEDIMENT CONTROL. 2) INSTALLATION OF YOUR SEDIMENT CONTROLS WILL BE INSPECTED AND APPROVED BY THE CITY OF TUCSON. 3) ENSURE A STABILIZED ENTRANCE/EXIT IS USED. 4) POSTA A COPY OF YOUR NOI/AUTHORIZATION NUMBER ON SITE. 5) SWEEP UP ANY TRACKING OF SOIL OFF ADJACENT ROADWAYS AS NEEDED. 6) DOCUMENT ANY CHANGES TO YOUR SWPPP AND DOCUMENT YOUR SELF INSPECTIONS.} |
|
| 05/20/2013 | ENGR Engineering Final | Passed | {Activity date: 05/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/14/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LANDSCAPE FINAL APPROVED. 2) NEED TO REMOVE ALL TEMP SEDIMENT CONTROLS 3) NEED TO PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE RET/DET BASIN WAS CONSTRUCTED PER THE APPROVED PLAN} ; {Activity date: 01/18/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT 1) DISTURBED AREAS NEED TO BE HYDROSEEDED PER PLAN 2) NEED ENG OF RECORDS CERT STATEMENT 3) NEED AS-BUILT 4) CONTRACTOR NEEDS TO COMPLETE LANDSCAPING 5) NEED TO REMOVE TEMP SEDIMENT CONTROLS} ; {Activity date: 01/16/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REMOVE TEMPORARY SEDIMENT CONTROLS 2) ALL DISTURBED AREAS NEED TO BE HYDROSEEDED, PER PLAN 3) GIVE JUSTIFICATION FOR THE CMU TO CHAIN LINK FENCE CHANGE 4) COMPLETE LANDSCAPING 5) PROVIDE BASIN CERT FROM THE ENG OF RECORD} ; {Activity date: 01/14/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE MOSTLY COMPLETE, CONTRACTOR WORKING ON RET/DET BASINS ALONG NORTH SIDE} ; {Activity date: 11/26/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE WORK DONE, HOWEVER, RET/DET BASIN HAS NOT BEEN COMPLETED PER APPROVED PLAN. CALL FOR FINAL APPROVAL WHEN COMPLETE.} ; {Activity date: 10/19/2012; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE MAJORITY OF THE SITE IS COMPLETE 2) SOME WORK BEING DONE ON RET/DET BASINS, ENSURE ROCK RIP RAP AND TOE DOWNS ARE INSTALLED PROPERLY. 3) SITE IS MOSTLY STABILIZED. ENSURE (NOT) IS FILED WITH THE STATE OF AZ 4) PROVIDE A CERT STATEMENT FROM YOUR ENG OF RECORD 5) SUBMIT AS-BUILT DRAWING AT FINAL } |
|
| 05/20/2013 | ENGR Grading Final | Passed | {Activity date: 05/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by CPIERCE1 - PER GRADING FINAL} |