Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/19/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - 1) THE MAJORITY OF THE SITE IS COMPLETE
2) SOME WORK BEING DONE ON RET/DET BASINS, ENSURE ROCK RIP RAP AND TOE DOWNS ARE INSTALLED PROPERLY.
3) SITE IS MOSTLY STABILIZED. ENSURE NOT IS FILED WITH THE STATE OF AZ
4) PROVIDE A CERT STATEMENT FROM YOUR ENG OF RECORD
5) SUBMIT AS-BUILT DRAWING AT FINAL
|
| 09/21/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SILT FENCE IS IN PLACE ALONG LOW POINTS OF THE PERIMETER OF THE SITE.
2) A CONSTRUCTED BIRM HAS BEEN INSTALLED ALONG OTHER AREAS OF THE BOUNDRY TO THE SITE.
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
4) CONTRACTOR INSTALLING BASES TO SOLAR PANELS AT VARIOUS INTERVALS.
5) A RET/DET BASIN HAS BEEN ROUGHED IN PER THE APPROVED PLAN.
NO OTHER CONCERNS AT THIS TIME |
| 09/19/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 09/11/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
| 09/05/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME. |
| 08/31/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) AN ENGINEERED "V" DITCH HAS BEEN INSTALLED ALONG THE PERIMETER OF THE SITE, AND WILL BE USED AS A BMP FOR SEDIMENT CONTROL.
2) ENSURE THE DITCH IS PROPERLY MAINTAINED AS NEEDED.
3) NO STABILIZED (ROCK) ENTRANCE/EXIT MAY BE NEEDED DUE TO THE LOCATION OF THE SITE. I WILL RE-EVALUATE DURING CONSTRUCTION.
4) ENSURE ALL CHANGES TO THE SWPPP AND SELF INSPECTIONS ARE DOCUMENTED. |
| 08/28/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - CONTRACTOR ROUGH GRADDING THE SITE . NO STORM WATER CONTROLS HAVE BEEN INSTALLED AS OF YET.
WILL RE- INSPECT TOMORROW FOR INSTALLATION. |