Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 03/14/2013 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) LANDSCAPE FINAL APPROVED.
2) NEED TO REMOVE ALL TEMP SEDIMENT CONTROLS
3) NEED TO PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE RET/DET BASIN WAS CONSTRUCTED PER THE APPROVED PLAN |
| 01/18/2013 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - |
| 01/16/2013 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - MAJORITY OF PLANTS HAVE NOT BEEN PLANTED, MOST OF THE GROUND COVER HAS BEEN INSTALLED. |
| 08/24/2012 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NEW CONSTRUCTION. SITE HAS AN APPROVED STORM WATER PLAN AND PERMIT. DUE TO SITE SPECIFICS AN ENGINEERED "V" DITCH MAY BE USED ALONG THE PERIMETER AS A SEDIMENT CONTROL.
2) INSTALLATION OF YOUR SEDIMENT CONTROLS WILL BE INSPECTED AND APPROVED BY THE CITY OF TUCSON.
3) ENSURE A STABILIZED ENTRANCE/EXIT IS USED.
4) POSTA A COPY OF YOUR NOI/AUTHORIZATION NUMBER ON SITE.
5) SWEEP UP ANY TRACKING OF SOIL OFF ADJACENT ROADWAYS AS NEEDED.
6) DOCUMENT ANY CHANGES TO YOUR SWPPP AND DOCUMENT YOUR SELF INSPECTIONS. |