Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
51 S PANTANO RD
Apply Date:
01/31/2012
Applicant:
Description:
O'REILLY AUTO PARTS @ 51 S PANTANO

Permit Reviews

Permit Number - DP12-0014
Permit Status: Complete
Permit Description: O'REILLY AUTO PARTS @ 51 S PANTANO
Start Date Submittal Complete Date Status  
01/31/2012 DEV PKG - OK TO SUBMIT 01/31/2012 COMPLETED Review Details
01/31/2012 SITE 03/16/2012 COMPLETED Review Details
02/13/2013 REVISION - SITE 03/15/2013 COMPLETED Review Details
03/20/2013 REVISION - SITE 03/22/2013 COMPLETED Review Details
08/03/2012 RESUB - SITE/GRADING ALL 09/06/2012 COMPLETED Review Details
09/28/2012 RESUB - SITE/GRADING ALL 11/09/2012 COMPLETED Review Details
11/09/2012 RESUB - SITE/GRADING ALL 11/21/2012 COMPLETED Review Details
11/21/2012 RESUB - SITE/GRADING ALL 01/16/2013 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP12-0014
Permite Description: O'REILLY AUTO PARTS @ 51 S PANTANO
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/23/2013 ENGR Grading Final N/A Complete (Recurring) {Activity date: 04/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NEED AS-BUILT AND ENGINEERING CERT
NO CHANGES} ; {Activity date: 04/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE CIVIL PLANS WERE APPROVED WITH NO DETAIL OR DESCRIPTION OF THE INSTALLATION OF A WATER HARVESTING SYSTEM TO INCLUDE A SUBSURFACE 15,000 GALLON TANK, CATCH BASIN AND PUMPING SYSTEM.
I CAN NOT APPROVE THE INSTALL BECAUSE IT IS NOT SHOWN ON AN APPROVED SET OF PLANS.

PRIOR TO FINAL APPROVAL FOR PERMIT#DP12-0014:
1) STABILIZE THE AREA AROUND THE RET/DET BASIN WITH ROCK OR HYDROSEED.
2) INSTALL THE EXTRUDED CURB SHOWN ON THE APPROVED PLANS AROUND THE PARKING LOT.
3) COMPLETE PARKING LOT
4) PROVIDE AN AS BUILT SHOWING ANY AND ALL CHANGES MADE FROM THE ORIGINAL APPROVED PLANS.
5) COMPLETE LANDSCAPING
6) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLANS.} ; {Activity date: 03/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - WATER HARVESTING TANK TO BE INSTALLED FRIDAY 3/22.
SUPERINTENDENT STATED THAT THEY MOVED THE LOCATION OF THE TANK FROM WHAT IS SHOWN ON THE APPROVED PLANS.
NO DETAILS ON INSTALLATION ARE PROVIDED
}
05/20/2013 ENGR Engineering Final N/A Complete (Recurring) {Activity date: 05/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME.
} ; {Activity date: 04/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NEED AS-BUILT AND ENGINEERING CERT
NO CHANGES} ; {Activity date: 04/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE CIVIL PLANS WERE APPROVED WITH NO DETAIL OR DESCRIPTION OF THE INSTALLATION OF A WATER HARVESTING SYSTEM TO INCLUDE A SUBSURFACE 15,000 GALLON TANK, CATCH BASIN AND PUMPING SYSTEM.
I CAN NOT APPROVE THE INSTALL BECAUSE IT IS NOT SHOWN ON AN APPROVED SET OF PLANS.

PRIOR TO FINAL APPROVAL FOR PERMIT#DP12-0014:
1) STABILIZE THE AREA AROUND THE RET/DET BASIN WITH ROCK OR HYDROSEED.
2) INSTALL THE EXTRUDED CURB SHOWN ON THE APPROVED PLANS AROUND THE PARKING LOT.
3) COMPLETE PARKING LOT
4) PROVIDE AN AS BUILT SHOWING ANY AND ALL CHANGES MADE FROM THE ORIGINAL APPROVED PLANS.
5) COMPLETE LANDSCAPING
6) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLANS.} ; {Activity date: 04/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) INSTALL BOLLARDS OR RAILING ALONG THE PERIMETER OF THE RET/DET BASIN BETWEEN THE BASIN AND THE ADJACENT PARKING AREA.
2) REMOVE THE STOCKPILE OF SOIL LOCATED ON SITE. STOCKPILE MUST BE REMOVED OR HAVE SEDIMENT CONTROLS INSTALLED, OR STABILIZED.
3) NO DETAIL ON REVISED PLAN FOR INSTALL OF WATER HARVESTING TANK, PIPING AND CATCH BASIN.
4) NEED DETAIL OF INSTALL OF 8" HDPE STORM PIPE. 12" HDPE WAS INSTALLED IN IT'S PLACE AND MUST BE SHOWN ON PLANS.
5) OK TO MOVE TRUNCATED DOMES AT PEDESTRIAN ACCESS IN FRONT OF BLDG.
6) OK TO POUR FOOTING FOR SIGN IN FRONT OF PARKING LOT. FORMS AND REBAR DONE PER PLAN}

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0014
Permit Description: O'REILLY AUTO PARTS @ 51 S PANTANO
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/16/2013 SITE - Stormwater Follow-up Passed {Activity date: 04/16/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) INSTALL BOLLARDS OR RAILING ALONG THE PERIMETER OF THE RET/DET BASIN BETWEEN THE BASIN AND THE ADJACENT PARKING AREA.
2) REMOVE THE STOCKPILE OF SOIL LOCATED ON SITE. STOCKPILE MUST BE REMOVED OR HAVE SEDIMENT CONTROLS INSTALLED, OR STABILIZED.
3) NO DETAIL ON REVISED PLAN FOR INSTALL OF WATER HARVESTING TANK, PIPING AND CATCH BASIN.
4) NEED DETAIL OF INSTALL OF 8" HDPE STORM PIPE. 12" HDPE WAS INSTALLED IN IT'S PLACE AND MUST BE SHOWN ON PLANS.
5) OK TO MOVE TRUNCATED DOMES AT PEDESTRIAN ACCESS IN FRONT OF BLDG.
6) OK TO POUR FOOTING FOR SIGN IN FRONT OF PARKING LOT. FORMS AND REBAR DONE PER PLAN} ; {Activity date: 03/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR INSTALLING 15,000 GAL TANK FOR WATER HARVESTING. NO DETAILS ON APPROVED PLANS SHOWING INSTALLATION. ENG. REVIEWER (LAUREN MANKUS) APPROVED THE INSTALLATION OF THE TANK. TOOK PICTURES OF EXCAVATION AND TANK.
NEED TO INSTALL SEDIMENT CONTROLS AROUND STOCKPILE FROM TANK EXCAVATION.}
04/16/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 04/16/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/14/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLED SEDIMENT CONTROLS ALONG PANTANO AND INSTALLED A ROCK ENTRANCE. HOWEVER, THE DISTURBED AREA OF CONSTRUCTION IS < 1 ACRE AND DOES NOT REQUIRE A SWPPP.
2) ENSURE TRACKING OF SOIL IS SWEPT OFF ADJACENT PUBLIC ROADWAY}
04/16/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/16/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - IN ACCORDANCE WITH THE ENGINEERING REVIEWER, NO SWPPP WAS NECESSARY.} ; {Activity date: 02/14/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT, DISCUSSED STORM WATER REQUIREMENTS AND SITE WORK CONSTRUCTION
2) IN ACCORDANCE WITH THE GRADING/SITE PLANS THE CONSTRUCTION IS 1.25 ACRES AND THEREFORE REQUIRES A STORM WATER PERMIT AND PLAN.
3) CONSTRUCTION HAS STARTED APRROXIMATELY 1 MONTH PRIOR TO BEING NOTIFIED OF THE SITES EXISTANCE.
4) A RET/DET BASIN HAS BEEN ROUGHED IN AND TRASH ENCLOSURE WALL HAVE BEEN CONSTRUCTED.
5) I WILL RESEACH THIS PERMIT AND DETERMINE WEATHER THE SITE REQUIRES A SWPPP OR NOT
}
04/23/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/23/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE CIVIL PLANS WERE APPROVED WITH NO DETAIL OR DESCRIPTION OF THE INSTALLATION OF A WATER HARVESTING SYSTEM TO INCLUDE A SUBSURFACE 15,000 GALLON TANK, CATCH BASIN AND PUMPING SYSTEM.
I CAN NOT APPROVE THE INSTALL BECAUSE IT IS NOT SHOWN ON AN APPROVED SET OF PLANS.

PRIOR TO FINAL APPROVAL FOR PERMIT#DP12-0014:
1) STABILIZE THE AREA AROUND THE RET/DET BASIN WITH ROCK OR HYDROSEED.
2) INSTALL THE EXTRUDED CURB SHOWN ON THE APPROVED PLANS AROUND THE PARKING LOT.
3) COMPLETE PARKING LOT
4) PROVIDE AN AS BUILT SHOWING ANY AND ALL CHANGES MADE FROM THE ORIGINAL APPROVED PLANS.
5) COMPLETE LANDSCAPING
6) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLANS.}

Documents

File Name Document Type  
None IMAGES VIEW
None IMAGES VIEW
None IMAGES VIEW
001_COVER SHEET_1 OF 16.TIF GRADING PLANS VIEW
002_DEVELOPMENT_2 OF 16.TIF GRADING PLANS VIEW
003_SITE GRADING_3 OF 16.TIF GRADING PLANS VIEW
004_DETAIL SHEET_4 OF 16.TIF GRADING PLANS VIEW
005_DETAIL SHEET_5 OF 16.TIF GRADING PLANS VIEW
006_SITE UTILITY_6 OF 16.TIF GRADING PLANS VIEW
007_LANDSCAPE_7 OF 16.TIF GRADING PLANS VIEW
008_LANDSCAPE_8 OF 16.TIF GRADING PLANS VIEW
009_LANDSCAPE_9 OF 16.TIF GRADING PLANS VIEW
010_LANDSCAPE_10 OF 16.TIF GRADING PLANS VIEW
011_LANDSCAPE_11 OF 16.TIF GRADING PLANS VIEW
012_LANDSCAPE_12 OF 16.TIF GRADING PLANS VIEW
013_LANDSCAPE_13 OF 16.TIF GRADING PLANS VIEW
014_LANDSCAPE_14 OF 16.TIF GRADING PLANS VIEW
015_SITE LIGHTING_SL1 OF 2.TIF GRADING PLANS VIEW
016_SITE PHOTOMETRIC_SL2 OF 2.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW