Permit: DP12-0014

Parcel: 13413057W


Addresses:

51 S PANTANO RD


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP12-0014

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
04/16/2013 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
04/03/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - PRIOR TO FINAL APPROVAL 1) INSTALL BOLLARDS OR RAILING ALONG THE PERIMETER OF THE RET/DET BASIN BETWEEN THE BASIN AND THE ADJACENT PARKING AREA. 2) REMOVE THE STOCKPILE OF SOIL LOCATED ON SITE. STOCKPILE MUST BE REMOVED OR HAVE SEDIMENT CONTROLS INSTALLED, OR STABILIZED. 3) NO DETAIL ON REVISED PLAN FOR INSTALL OF WATER HARVESTING TANK, PIPING AND CATCH BASIN. 4) NEED DETAIL OF INSTALL OF 8" HDPE STORM PIPE. 12" HDPE WAS INSTALLED IN IT'S PLACE AND MUST BE SHOWN ON PLANS. 5) OK TO MOVE TRUNCATED DOMES AT PEDESTRIAN ACCESS IN FRONT OF BLDG. 6) OK TO POUR FOOTING FOR SIGN IN FRONT OF PARKING LOT. FORMS AND REBAR DONE PER PLAN
03/25/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - CONTRACTOR INSTALLING 15,000 GAL TANK FOR WATER HARVESTING. NO DETAILS ON APPROVED PLANS SHOWING INSTALLATION. ENG. REVIEWER (LAUREN MANKUS) APPROVED THE INSTALLATION OF THE TANK. TOOK PICTURES OF EXCAVATION AND TANK. NEED TO INSTALL SEDIMENT CONTROLS AROUND STOCKPILE FROM TANK EXCAVATION.