Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 03/14/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR INSTALLED SEDIMENT CONTROLS ALONG PANTANO AND INSTALLED A ROCK ENTRANCE. HOWEVER, THE DISTURBED AREA OF CONSTRUCTION IS < 1 ACRE AND DOES NOT REQUIRE A SWPPP.
2) ENSURE TRACKING OF SOIL IS SWEPT OFF ADJACENT PUBLIC ROADWAY |