Permit: DP12-0014

Parcel: 13413057W


Addresses:

51 S PANTANO RD


Inspection Status: Complete (Recurring)

Inspection History: ENGR Engineering Final

Permit Number - DP12-0014

Inspection Description - ENGR Engineering Final

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
05/20/2013 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME.
04/23/2013 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - NEED AS-BUILT AND ENGINEERING CERT NO CHANGES
04/16/2013 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - THE CIVIL PLANS WERE APPROVED WITH NO DETAIL OR DESCRIPTION OF THE INSTALLATION OF A WATER HARVESTING SYSTEM TO INCLUDE A SUBSURFACE 15,000 GALLON TANK, CATCH BASIN AND PUMPING SYSTEM. I CAN NOT APPROVE THE INSTALL BECAUSE IT IS NOT SHOWN ON AN APPROVED SET OF PLANS. PRIOR TO FINAL APPROVAL FOR PERMIT#DP12-0014: 1) STABILIZE THE AREA AROUND THE RET/DET BASIN WITH ROCK OR HYDROSEED. 2) INSTALL THE EXTRUDED CURB SHOWN ON THE APPROVED PLANS AROUND THE PARKING LOT. 3) COMPLETE PARKING LOT 4) PROVIDE AN AS BUILT SHOWING ANY AND ALL CHANGES MADE FROM THE ORIGINAL APPROVED PLANS. 5) COMPLETE LANDSCAPING 6) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLANS.
04/03/2013 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - PRIOR TO FINAL APPROVAL 1) INSTALL BOLLARDS OR RAILING ALONG THE PERIMETER OF THE RET/DET BASIN BETWEEN THE BASIN AND THE ADJACENT PARKING AREA. 2) REMOVE THE STOCKPILE OF SOIL LOCATED ON SITE. STOCKPILE MUST BE REMOVED OR HAVE SEDIMENT CONTROLS INSTALLED, OR STABILIZED. 3) NO DETAIL ON REVISED PLAN FOR INSTALL OF WATER HARVESTING TANK, PIPING AND CATCH BASIN. 4) NEED DETAIL OF INSTALL OF 8" HDPE STORM PIPE. 12" HDPE WAS INSTALLED IN IT'S PLACE AND MUST BE SHOWN ON PLANS. 5) OK TO MOVE TRUNCATED DOMES AT PEDESTRIAN ACCESS IN FRONT OF BLDG. 6) OK TO POUR FOOTING FOR SIGN IN FRONT OF PARKING LOT. FORMS AND REBAR DONE PER PLAN