Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - IN ACCORDANCE WITH THE ENGINEERING REVIEWER, NO SWPPP WAS NECESSARY. |
| 02/14/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT, DISCUSSED STORM WATER REQUIREMENTS AND SITE WORK CONSTRUCTION
2) IN ACCORDANCE WITH THE GRADING/SITE PLANS THE CONSTRUCTION IS 1.25 ACRES AND THEREFORE REQUIRES A STORM WATER PERMIT AND PLAN.
3) CONSTRUCTION HAS STARTED APRROXIMATELY 1 MONTH PRIOR TO BEING NOTIFIED OF THE SITES EXISTANCE.
4) A RET/DET BASIN HAS BEEN ROUGHED IN AND TRASH ENCLOSURE WALL HAVE BEEN CONSTRUCTED.
5) I WILL RESEACH THIS PERMIT AND DETERMINE WEATHER THE SITE REQUIRES A SWPPP OR NOT
|