Status:
Complete
Type:
Development Package
Apply Date:
12/16/2011
Applicant:
Description:
SITE/GRADING/SWPPP

Permit Reviews

Permit Number - DP11-0022
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP
Start Date Submittal Complete Date Status  
01/24/2013 DEV PKG - RESUBMITTAL 02/28/2013 COMPLETED Review Details
09/07/2012 DEV PKG - RESUBMITTAL 10/17/2012 COMPLETED Review Details
12/16/2011 DEV PKG - OK TO SUBMIT (SITE) 12/19/2011 COMPLETED Review Details
12/19/2011 DEV PKG 01/25/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP11-0022
Permit Description: SITE/GRADING/SWPPP
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/08/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/08/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED SWPPP. CALL FOR INSPECTION
2) IDENTIFY YOUR GRADING LIMIT
3) LIMIT WORK IN OR AROUND THE REGULATED WASH ADJACENT TO YOUR SITE
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
5) INSTALL A STABILIZED ENTRANCE ASAP
6) CALL FOR INSPECTION WHEN TRANSPLANTED PLANTS ARE IN TEMP NUSERY.}
05/15/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 05/15/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/12/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SILT SOCK HAS BEEN INSTALLED PER SWPPP
2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED.
3) SUPPLEMENTAL SEDIMENT CONTROLS MADE NEED TO BE INSTALLED WHEN UTILITIES ARE BROUGHT ACROSS THE WASH FROM THE NW CORNER.
4) INSTALL A CONCRETE/MATERIALS WASH OUT AS SOON AS PACTICABLE.
5) CALL FOR RE-INSPECTION}
10/08/2013 SITE - Stormwater Follow-up Passed {Activity date: 10/08/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL

1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION} ; {Activity date: 09/17/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AND/OR CHANGES AT THIS TIME} ; {Activity date: 08/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME EROSION OF SLOPES AND WEST SIDE OF SITE.
NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WORK ON BLDG, NO SIGNIFICANT SITE WORK BEING DONE
2) EROSION DAMAGE OF SLOPES, NEED REPAIRED
3) RE-ESTABLISH SEDIMENT CONTROLS AROUND ADJACENT WASH
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WALKED PERIMETER OF SITE
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
3) ADJACENT WASH MUST BE REPAIRED BACK TO PRE-CONSTRUCTION CONDITION
4) CONTRACTOR IS GOING TO WORK ON FINAL STABILIZATION OF THE SLOPES ON SITE} ; {Activity date: 06/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STORM WATER CONTROLS ARE IN PLACE
2) ENSURE STORM WATER MAINT IS PERFORMED THROUGHOUT CONSTUCTION.
3) SWEEP UP TRACKING OFF OF ADJACENT ROADWAYS.
4) ENSURE REGULATED WASH IS RESTORED TO PRE-CONSTRUCTION CONDITION
} ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
NO CHANGES TO THE GRADING PLAN
UTILITY WORK BEING DONE, SOME SITE WORK} ; {Activity date: 04/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN REPAIRED AND REPLACE.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/19/2013; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR AND/OR REPLACE SECTIONS OF SILT SOCK ALONG PERIMETER OF SITE.
2) ENSURE CONSTRUCTION MATERIALS (MORTAR, GROUT, PAINT...) STAY ON SITE.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
4) CONTRACTOR WORKING ON BLDG FOOTINGS AND FOUNDATION. SOME WORK ON BLDG PAD COMPACTION.

CALL FOR RE-INSPECTION} ; {Activity date: 04/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
ENSURE STORM WATER SELF INSPECTIONS ARE COMPLETED AND DOCUMENTED PER YOUR PLAN} ; {Activity date: 04/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) ENSURE TRACKING IS SWEPT UP ROUTINELY
4) CALL FOR INSPECTION FOR ANY UNDERGROUND STORM PIPE INSTALL} ; {Activity date: 03/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE REGULATED WASH USED AS A CONSTRUCTION ACCESS POINT TO HAUL SOIL ON SITE MUST BE RESTORED TO PRE-CONSTRUCTION CONDITITON PRIOT TO FINAL APPROVAL
2) SEDIMENT CONTROLS ARE IN PLACE. NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
3) BLDG PAD IS BEING CONSTRUCTED} ; {Activity date: 03/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR NEARLY COMPLETE MOVING SOIL ONTO SITE.
SEDIMENT CONTROLS ARE IN PLACE ALONG WASH AT ACCESS POINT
IN ORDER TO COMPLY WITH STORM WATER REQUIREMENTS THE CONTRACTOR MUST MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION} ; {Activity date: 03/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN ADDED TO THE AREA CROSSING THE 404 WASH.
2) CONTROLS NEED TO BE MAINTAINED AS LONG ACCES IS BEING USED IN THE WASH
3) WASH NEED TO BE RESTORED TO PRE-CONSTRUCTION STATE PRIOR TO FINAL APPROVAL
4) SEDIMENT CONTROLS NEED TO BE INSTALLED AROUND THE STOCK PILE UNTIL REMOVED.} ; {Activity date: 03/15/2013; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) DUE TO CONSTRUCTION WORK IN THE EXISTING DRAINAGE AND ADJACENT PROPERTY, SUPPLEMENTAL SEDIMENT CONTROLS MUST BE ADDED AT THE PERIMETER OF CONSTRUCTION. CONTROLS MUST BE MAINTAINED AND IN PLACE UNTIL CONSTRUCTION IS COMPLETE.
2) YOUR SITE IS CURRENTLY IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT.
3) CORRECT YOUR NON-COMPLIANCE WITH-IN 7 WORKING DAYS.
4) CONTINUED NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION AND NOTIFICATION OF ADEQ}
10/08/2013 ENGR Grading Final Passed {Activity date: 10/08/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL

1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION} ; {Activity date: 09/17/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLING GROUTED RIP RAP ALONG THE SLOPE AT THE NORTH SIDE OF THE SITE.
2) CONTRACTOR PREPPING FOR PAVING} ; {Activity date: 08/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME EROSION CONTROL ALONG SIDE SLOPES STILL TO BE DONE.
SITE STILL MUST BE PAVED
NO OTHER CONCERNS OR CHANGES} ; {Activity date: 07/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONCERNS AND/OR CHANGES AT THIS TIME} ; {Activity date: 07/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WORK ON BLDG, NO SIGNIFICANT SITE WORK BEING DONE
2) EROSION DAMAGE OF SLOPES, NEED REPAIRED
3) RE-ESTABLISH SEDIMENT CONTROLS AROUND ADJACENT WASH
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WALKED PERIMETER OF SITE
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
3) ADJACENT WASH MUST BE REPAIRED BACK TO PRE-CONSTRUCTION CONDITION
4) CONTRACTOR IS GOING TO WORK ON FINAL STABILIZATION OF THE SLOPES ON SITE} ; {Activity date: 06/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SITE WORK AT THIS TIME.
PERIMETER WALL BEING INSTALLED ALONG THE SOUTH SIDE} ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
NO CHANGES TO THE GRADING PLAN
UTILITY WORK BEING DONE, SOME SITE WORK} ; {Activity date: 04/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR IS INSTALLING A SEWER LINE CROSSING THE WASH, ENSURE SEDIEMNT CONTROLS ARE IN PLACE DURING CONSTRUCTION.
WASH MUST BE REPAIRED TO PRE-CONSTRUCTION CONDITION AFTER INSTALL} ; {Activity date: 04/05/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE REGULATED WASH USED AS A CONSTRUCTION ACCESS POINT TO HAUL SOIL ON SITE MUST BE RESTORED TO PRE-CONSTRUCTION CONDITITON PRIOT TO FINAL APPROVAL
2) SEDIMENT CONTROLS ARE IN PLACE. NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
3) BLDG PAD IS BEING CONSTRUCTED}
10/08/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 10/08/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY OR CONSTRUCTION AT THIS TIME} ; {Activity date: 01/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION AT THIS TIME}
10/30/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE ALL AREAS DISTURBED DURING CONSTRUCTION ARE STABILIZED USING HYDROSEEDING DESCRIBED IN THE APPROVED PLANS.
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD
3) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON.
4) PROVIDE A LETTER FROM THE LANDSCAPE ARCHITECT APPROVING THE CHANGES MADE TO THE LANDSCAPE PLAN} ; {Activity date: 10/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL

1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION}
10/30/2013 SITE - Stormwater Final Inspection Passed {Activity date: 10/30/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE ALL AREAS DISTURBED DURING CONSTRUCTION ARE STABILIZED USING HYDROSEEDING DESCRIBED IN THE APPROVED PLANS.
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD
3) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON.
4) PROVIDE A LETTER FROM THE LANDSCAPE ARCHITECT APPROVING THE CHANGES MADE TO THE LANDSCAPE PLAN} ; {Activity date: 10/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL

1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION}
11/04/2013 ENGR Engineering Final Passed {Activity date: 11/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/30/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR HYDROSEEDED AREA ALONG WASH AND DISTURBED AREAS AROUND THE SITE.
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD
3) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON.
4) PROVIDE A LETTER FROM THE LANDSCAPE ARCHITECT APPROVING THE CHANGES MADE TO THE LANDSCAPE PLAN} ; {Activity date: 10/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE ALL AREAS DISTURBED DURING CONSTRUCTION ARE STABILIZED USING HYDROSEEDING DESCRIBED IN THE APPROVED PLANS.
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD
3) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON.
4) PROVIDE A LETTER FROM THE LANDSCAPE ARCHITECT APPROVING THE CHANGES MADE TO THE LANDSCAPE PLAN} ; {Activity date: 10/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL

1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION} ; {Activity date: 03/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) THE REGULATED WASH USED AS A CONSTRUCTION ACCESS POINT TO HAUL SOIL ON SITE MUST BE RESTORED TO PRE-CONSTRUCTION CONDITITON PRIOT TO FINAL APPROVAL
2) SEDIMENT CONTROLS ARE IN PLACE. NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
3) BLDG PAD IS BEING CONSTRUCTED} ; {Activity date: 03/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN ADDED TO THE AREA CROSSING THE 404 WASH.
2) CONTROLS NEED TO BE MAINTAINED AS LONG ACCES IS BEING USED IN THE WASH
3) WASH NEED TO BE RESTORED TO PRE-CONSTRUCTION STATE PRIOR TO FINAL APPROVAL
4) SEDIMENT CONTROLS NEED TO BE INSTALLED AROUND THE STOCK PILE UNTIL REMOVED.}
10/28/2014 RSBU - Building Final Passed {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 13.TIF GRADING PLANS VIEW
002_NOTES/REZONING CONDITIONS_2 OF 13.TIF GRADING PLANS VIEW
003_SITE_3 OF 13.TIF GRADING PLANS VIEW
004_DETAILS_4 OF 13.TIF GRADING PLANS VIEW
005_PAVING/GRADING/DRAINAGE_5 OF 13.TIF GRADING PLANS VIEW
006_GRADING_6 OF 13.TIF GRADING PLANS VIEW
007_GRADING/CROSS SECTIONS_7 OF 13.TIF GRADING PLANS VIEW
008_DETAILS_8 OF 13.TIF GRADING PLANS VIEW
009_SWPPP_9 OF 13.TIF GRADING PLANS VIEW
010_LANDSCAPE_10 OF 13.TIF GRADING PLANS VIEW
011_IRRIGATION_11 OF 13.TIF GRADING PLANS VIEW
012_LANDSCAPE DETAILS_12 OF 13.TIF GRADING PLANS VIEW
013_IRRIGATION DETAILS_13 OF 13.TIF GRADING PLANS VIEW
PDSD EMAIL.PDF DOCUMENTS VIEW
EXTENSION EMAIL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW