Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2013 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 10/16/2013 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE ALL AREAS DISTURBED DURING CONSTRUCTION ARE STABILIZED USING HYDROSEEDING DESCRIBED IN THE APPROVED PLANS.
2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD
3) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON.
4) PROVIDE A LETTER FROM THE LANDSCAPE ARCHITECT APPROVING THE CHANGES MADE TO THE LANDSCAPE PLAN |
| 10/08/2013 |
PDSD Site/Engineering Division - Landscaping |
MRUSSO |
Continued |
Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION |