Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/08/2013 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) COMPLETE SITE WORK PER THE APPROVED PLAN.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN
3) PROVIDE AN AS BUILT DRAWING
4) COMPLETE ALL LANDSCAPING PER PLAN
5) RESTORE ADJACENT WASH TO PRE-CONSTRUCTION CONDITION/HYROSEED AND REMOVAL OF DEBRIS
6) FILE A NOTICE OF TERMINATION (NOT) WITH ADEQ
7) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH ON CHANGES MADE TO LANDSCAPE STABILIZATION |
| 09/17/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR INSTALLING GROUTED RIP RAP ALONG THE SLOPE AT THE NORTH SIDE OF THE SITE.
2) CONTRACTOR PREPPING FOR PAVING |
| 08/28/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - SOME EROSION CONTROL ALONG SIDE SLOPES STILL TO BE DONE.
SITE STILL MUST BE PAVED
NO OTHER CONCERNS OR CHANGES |
| 07/23/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CONCERNS AND/OR CHANGES AT THIS TIME |
| 07/12/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) WORK ON BLDG, NO SIGNIFICANT SITE WORK BEING DONE
2) EROSION DAMAGE OF SLOPES, NEED REPAIRED
3) RE-ESTABLISH SEDIMENT CONTROLS AROUND ADJACENT WASH
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
| 06/27/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) WALKED PERIMETER OF SITE
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
3) ADJACENT WASH MUST BE REPAIRED BACK TO PRE-CONSTRUCTION CONDITION
4) CONTRACTOR IS GOING TO WORK ON FINAL STABILIZATION OF THE SLOPES ON SITE |
| 06/11/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO SITE WORK AT THIS TIME.
PERIMETER WALL BEING INSTALLED ALONG THE SOUTH SIDE |
| 05/01/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
NO CHANGES TO THE GRADING PLAN
UTILITY WORK BEING DONE, SOME SITE WORK |
| 04/24/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR IS INSTALLING A SEWER LINE CROSSING THE WASH, ENSURE SEDIEMNT CONTROLS ARE IN PLACE DURING CONSTRUCTION.
WASH MUST BE REPAIRED TO PRE-CONSTRUCTION CONDITION AFTER INSTALL |
| 04/05/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - |
| 03/27/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) THE REGULATED WASH USED AS A CONSTRUCTION ACCESS POINT TO HAUL SOIL ON SITE MUST BE RESTORED TO PRE-CONSTRUCTION CONDITITON PRIOT TO FINAL APPROVAL
2) SEDIMENT CONTROLS ARE IN PLACE. NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
3) BLDG PAD IS BEING CONSTRUCTED |