Parcel Search: 21116006A
Parcel Search
Parcel Attributes
| Parcel | 21116006A |
|---|---|
| Jurisdiction | Pima County |
| Flood Related Information | FEMA Floodplain Area |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Permits
Parcel Number - 21116006A
Date - 08/17/2026 1:47 a.m.
Total Number Of Permits - (42)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TW-CONS-0426-0050 | Inspections | 04/06/2026 | N/A | TW CIP Planning & Engineering | Herman's scope includes RB-104, RB-107 and RB 108 for this permit. | |
| TC-COM-0426-00564 | Issued | 04/16/2026 | N/A | Commercial Building | See CIP-0825-00020 for prior initial and final reviews. Parcel: 21116006A, 12805 W MILE WIDE RD MARANA, AZ 85653 (Pima County Jurisdiction). System was giving me issues but this goes through the city as is a Tucson Water CIP project on city property. | |
| TW-CONS-0426-0051 | Inspections | 04/16/2026 | N/A | TW CIP Planning & Engineering | PJW947, Package II, Construction-E, KE&G scope includes RB-101 and RB-105 for this permit. | |
| TD-DEV-0823-00348 | Void | 08/07/2023 | 08/06/2024 | Development Package | VOID - Application was rejected at OK's to submit and customer was told to apply for a utility permit - Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. | |
| TR-UTL-0823-02308 | Void | 08/17/2023 | N/A | Right-of-Way (ROW) - Utility | Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. | |
| TC-COM-0823-02029 | Issued | 08/21/2023 | 04/15/2026 | Commercial Building | Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. Tarlton Ferrin, the TW PM, was advised that PDSD permit would be waived and this Commercial Trade Permit application is needed instead. NOTE: Please note we checked "Commercial/Industrial Building" for Structure Type because a choice was required but is not fully appliable to the project. | |
| TC-COM-1125-02098 | Issued | 11/13/2025 | 06/28/2026 | Commercial Building | This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151 | |
| TC-COM-1225-02182 | Submitted | 12/04/2025 | N/A | Commercial Building | This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151 | |
| TD-DEV-1225-00300 | Submitted | 12/04/2025 | N/A | Development Package | This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151 | |
| T00CM01978 | Expired | 04/18/2000 | 11/04/2001 | COMBO | WELL SITE | |
| T00CM01979 | Expired | 04/18/2000 | 11/05/2001 | COMBO | WELL SITE | |
| T00CM01980 | Expired | 04/18/2000 | 11/04/2001 | COMBO | WELL SITE | |
| T00CM02316 | Expired | 05/05/2000 | 10/14/2001 | COMBO | WELL SITE/FENCING/CONTROL BUILDING/20 ANTENNA 8.67 x 8.67 MASONRY CONTROL BUILDING W/ CONCRETEROOF | |
| T00CM03376 | Final | 07/07/2000 | 08/12/2001 | COMBO | WELL SITE | |
| T00CM03377 | Final | 07/07/2000 | 08/12/2001 | COMBO | WELL SITE | |
| T02CM00066 | Expired | 01/07/2002 | 02/05/2003 | COMBO | WELL SITE: | |
| T02CM02119 | Expired | 04/25/2002 | 10/22/2003 | COMBO | NEW:WELL SITE | |
| T02CM02120 | Expired | 04/25/2002 | 10/08/2003 | COMBO | NEW:WELL SITE | |
| T02CM02122 | Expired | 04/25/2002 | 10/22/2003 | COMBO | NEW:WELL SITE | |
| T02CM02525 | Final | 05/21/2002 | 10/05/2003 | COMBO | NEW:RECHARGE BASINS:CONTROL BUILDING | |
| T02CM02526 | Expired | 05/21/2002 | 10/05/2003 | COMBO | NEW:RECHARGE BASINS:CONTROL BUILDING | |
| T02CM02527 | Expired | 05/21/2002 | 10/05/2003 | COMBO | NEW:RECHARGE BASINS:CONTROL BUILDING | |
| T02CM02528 | Expired | 05/21/2002 | 10/20/2003 | COMBO | NEW:RECHARGE BASINS:CONTROL BUILDING | |
| T02CM02529 | Expired | 05/21/2002 | 10/20/2003 | COMBO | NEW:RECHARGE BASINS:CONTROL BUILDING | |
| T02CM02530 | Expired | 05/21/2002 | 10/20/2003 | COMBO | NEW:RECHARGE BASINS:CONTROL BUILDING | |
| T02CM04391 | Final | 09/18/2002 | 09/30/2003 | COMBO | WELL SITE: | |
| T05CM04734 | Expired | 09/15/2005 | 12/16/2006 | COMBO | EQUIP NEW WELL SITE 10' x 11' MASONRY CONTROL BUILDING | |
| T07CM00607 | Expired | 02/14/2007 | 03/08/2008 | COMBO | WELL SITE AND CONTROL BUILDING | |
| T09CM02372 | Final | 09/04/2009 | 01/22/2011 | COMBO | BOOSTER STATION | |
| T10CM01422 | Final | 05/25/2010 | 01/03/2011 | COMBO | UPGRADE A/C UNIT FOR VAULT (BOOSTER STATION) | |
| T18CM06828 | Expired | 08/29/2018 | 07/03/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM06945 | Final | 09/04/2018 | 06/26/2019 | COMBO | CA-001A/ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM06946 | Final | 09/04/2018 | 07/07/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM06947 | Final | 09/04/2018 | 07/10/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM06990 | Final | 09/05/2018 | 07/28/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM06997 | Final | 09/05/2018 | 07/23/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM06998 | Final | 09/05/2018 | 07/22/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM07000 | Final | 09/05/2018 | 07/30/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM07001 | Final | 09/05/2018 | 07/23/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T18CM07002 | Final | 09/05/2018 | 07/28/2019 | COMBO | ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS | |
| T19CM05706 | Final | 08/08/2019 | 09/13/2020 | COMBO | E -Construction of minor electrical improvements and/or repairs as shown on plans -Well CA-008A | |
| T99CM04223 | Closed | 09/02/1999 | 08/06/2001 | COMBO | 10 MILLION GAL RESERVOIR & BOOSTER STATION 1.54000 SF (300 x 180) RESERVOIR, REINFORCED CONCRETE RETAINING WALL AND ALUMINUM ROOF SYSTEM 2.1200 SF (60 x 20) CONTROL BUILDING CMU WALLS W/ WOOD ROOF TRUSSES,PLYWOOD SHEATHING AND METAL ROOFING 3.36000 GALLON (12DIA. x 48) HYDROPNEUMATIC TANK OF STEEL |
Plans
Parcel Number - 21116006A
Date - 08/17/2026 1:47 a.m.
Total Number Of Plans - 8
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CIP-0324-00004 | In review | 03/06/2024 | N/A | Capital Improvement Project | ||
| CIP-0825-00020 | Needs resubmittal | 08/28/2025 | N/A | Capital Improvement Project | Replacement of existing PRVs with new PRVs, plans to install a new third PRV. Some site modifications and upgrades. | |
| CIP-0924-00033 | In review | 09/13/2024 | N/A | Capital Improvement Project | This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151 | |
| CIP-1125-00028 | In review | 11/18/2025 | N/A | Capital Improvement Project | CIP-WTR-1125-0013 • Equip Well CA-018B | |
| TP-PRE-0523-00227 | Complete | 05/31/2023 | N/A | Pre-Application | Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design will focus on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) will provide design services for the project. Tucson Water is the owner and the client. | |
| TW-PLAN-0426-0082 | Administrative processing | 04/03/2026 | N/A | TW CIP Planning & Engineering | CAVSARP MOV sites 101 & 105 are nearing completion. KE&G is reporting that they will have their work finished on the Aug 19th, 2026. | |
| TW-PLAN-0426-0085 | Administrative processing | 04/06/2026 | N/A | TW CIP Planning & Engineering | PJW948. Replacement of two existing PRVs and addition of a third new PRV at this large diameter pipe PRV station. Includes new electrical building to no longer be in flood plain. Includes work related to the perimeter wall and gates. Includes cathodic protection. Description added 4/16/2026 - TVF. | |
| TW-PLAN-0526-0118 | In review | 05/08/2026 | N/A | TW CIP Planning & Engineering | This plan set is for RB-109 and RB-110 for the Pressure Relief Valve bypass piping and instrumentation. |