Permit Permit Status Entered Date Expired Date Unit Type Description
TW-CONS-0426-0050 Inspections 04/06/2026 N/A TW CIP Planning & Engineering Herman's scope includes RB-104, RB-107 and RB 108 for this permit.
TC-COM-0426-00564 Issued 04/16/2026 N/A Commercial Building See CIP-0825-00020 for prior initial and final reviews. Parcel: 21116006A, 12805 W MILE WIDE RD MARANA, AZ 85653 (Pima County Jurisdiction). System was giving me issues but this goes through the city as is a Tucson Water CIP project on city property.
TW-CONS-0426-0051 Inspections 04/16/2026 N/A TW CIP Planning & Engineering PJW947, Package II, Construction-E, KE&G scope includes RB-101 and RB-105 for this permit.
TD-DEV-0823-00348 Void 08/07/2023 08/06/2024 Development Package VOID - Application was rejected at OK's to submit and customer was told to apply for a utility permit - Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client.
TR-UTL-0823-02308 Void 08/17/2023 N/A Right-of-Way (ROW) - Utility Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client.
TC-COM-0823-02029 Issued 08/21/2023 04/15/2026 Commercial Building Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. Tarlton Ferrin, the TW PM, was advised that PDSD permit would be waived and this Commercial Trade Permit application is needed instead. NOTE: Please note we checked "Commercial/Industrial Building" for Structure Type because a choice was required but is not fully appliable to the project.
TC-COM-1125-02098 Issued 11/13/2025 06/28/2026 Commercial Building This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
TC-COM-1225-02182 Submitted 12/04/2025 N/A Commercial Building This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
TD-DEV-1225-00300 Submitted 12/04/2025 N/A Development Package This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
T00CM01978 Expired 04/18/2000 11/04/2001 COMBO WELL SITE
T00CM01979 Expired 04/18/2000 11/05/2001 COMBO WELL SITE
T00CM01980 Expired 04/18/2000 11/04/2001 COMBO WELL SITE
T00CM02316 Expired 05/05/2000 10/14/2001 COMBO WELL SITE/FENCING/CONTROL BUILDING/20 ANTENNA 8.67 x 8.67 MASONRY CONTROL BUILDING W/ CONCRETEROOF
T00CM03376 Final 07/07/2000 08/12/2001 COMBO WELL SITE
T00CM03377 Final 07/07/2000 08/12/2001 COMBO WELL SITE
T02CM00066 Expired 01/07/2002 02/05/2003 COMBO WELL SITE:
T02CM02119 Expired 04/25/2002 10/22/2003 COMBO NEW:WELL SITE
T02CM02120 Expired 04/25/2002 10/08/2003 COMBO NEW:WELL SITE
T02CM02122 Expired 04/25/2002 10/22/2003 COMBO NEW:WELL SITE
T02CM02525 Final 05/21/2002 10/05/2003 COMBO NEW:RECHARGE BASINS:CONTROL BUILDING
T02CM02526 Expired 05/21/2002 10/05/2003 COMBO NEW:RECHARGE BASINS:CONTROL BUILDING
T02CM02527 Expired 05/21/2002 10/05/2003 COMBO NEW:RECHARGE BASINS:CONTROL BUILDING
T02CM02528 Expired 05/21/2002 10/20/2003 COMBO NEW:RECHARGE BASINS:CONTROL BUILDING
T02CM02529 Expired 05/21/2002 10/20/2003 COMBO NEW:RECHARGE BASINS:CONTROL BUILDING
T02CM02530 Expired 05/21/2002 10/20/2003 COMBO NEW:RECHARGE BASINS:CONTROL BUILDING
T02CM04391 Final 09/18/2002 09/30/2003 COMBO WELL SITE:
T05CM04734 Expired 09/15/2005 12/16/2006 COMBO EQUIP NEW WELL SITE 10' x 11' MASONRY CONTROL BUILDING
T07CM00607 Expired 02/14/2007 03/08/2008 COMBO WELL SITE AND CONTROL BUILDING
T09CM02372 Final 09/04/2009 01/22/2011 COMBO BOOSTER STATION
T10CM01422 Final 05/25/2010 01/03/2011 COMBO UPGRADE A/C UNIT FOR VAULT (BOOSTER STATION)
T18CM06828 Expired 08/29/2018 07/03/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM06945 Final 09/04/2018 06/26/2019 COMBO CA-001A/ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM06946 Final 09/04/2018 07/07/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM06947 Final 09/04/2018 07/10/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM06990 Final 09/05/2018 07/28/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM06997 Final 09/05/2018 07/23/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM06998 Final 09/05/2018 07/22/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM07000 Final 09/05/2018 07/30/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM07001 Final 09/05/2018 07/23/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T18CM07002 Final 09/05/2018 07/28/2019 COMBO ELECTRICAL IMPROVEMENTS AND REPAIRS TO WELLS
T19CM05706 Final 08/08/2019 09/13/2020 COMBO E -Construction of minor electrical improvements and/or repairs as shown on plans -Well CA-008A
T99CM04223 Closed 09/02/1999 08/06/2001 COMBO 10 MILLION GAL RESERVOIR & BOOSTER STATION 1.54000 SF (300 x 180) RESERVOIR, REINFORCED CONCRETE RETAINING WALL AND ALUMINUM ROOF SYSTEM 2.1200 SF (60 x 20) CONTROL BUILDING CMU WALLS W/ WOOD ROOF TRUSSES,PLYWOOD SHEATHING AND METAL ROOFING 3.36000 GALLON (12DIA. x 48) HYDROPNEUMATIC TANK OF STEEL

Plans

Parcel Number - 21116006A
Date - 08/17/2026 1:47 a.m.
Total Number Of Plans - 8
Plan Number Plan Status Application Date Expired Date Unit Type Description
CIP-0324-00004 In review 03/06/2024 N/A Capital Improvement Project
CIP-0825-00020 Needs resubmittal 08/28/2025 N/A Capital Improvement Project Replacement of existing PRVs with new PRVs, plans to install a new third PRV. Some site modifications and upgrades.
CIP-0924-00033 In review 09/13/2024 N/A Capital Improvement Project This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
CIP-1125-00028 In review 11/18/2025 N/A Capital Improvement Project CIP-WTR-1125-0013 • Equip Well CA-018B
TP-PRE-0523-00227 Complete 05/31/2023 N/A Pre-Application Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design will focus on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) will provide design services for the project. Tucson Water is the owner and the client.
TW-PLAN-0426-0082 Administrative processing 04/03/2026 N/A TW CIP Planning & Engineering CAVSARP MOV sites 101 & 105 are nearing completion. KE&G is reporting that they will have their work finished on the Aug 19th, 2026.
TW-PLAN-0426-0085 Administrative processing 04/06/2026 N/A TW CIP Planning & Engineering PJW948. Replacement of two existing PRVs and addition of a third new PRV at this large diameter pipe PRV station. Includes new electrical building to no longer be in flood plain. Includes work related to the perimeter wall and gates. Includes cathodic protection. Description added 4/16/2026 - TVF.
TW-PLAN-0526-0118 In review 05/08/2026 N/A TW CIP Planning & Engineering This plan set is for RB-109 and RB-110 for the Pressure Relief Valve bypass piping and instrumentation.