Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
12635 W MILE WIDE RD
Apply Date:
08/21/2023
Applicant:
Kiersten Wangsvick
Description:
Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. Tarlton Ferrin, the TW PM, was advised that PDSD permit would be waived and this Commercial Trade Permit application is needed instead. NOTE: Please note we checked "Commercial/Industrial Building" for Structure Type because a choice was required but is not fully appliable to the project.

Permit Reviews

Permit Number - TC-COM-0823-02029
Permit Status: Issued
Permit Description: Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. Tarlton Ferrin, the TW PM, was advised that PDSD permit would be waived and this Commercial Trade Permit application is needed instead. NOTE: Please note we checked "Commercial/Industrial Building" for Structure Type because a choice was required but is not fully appliable to the project.
Start Date Submittal Complete Date Status  
01/19/2024 COMMERCIAL PDSD SIMPLE REVIEW v.2 02/05/2024 REQUIRES RESUBMIT Review Details
03/05/2024 COMMERCIAL PDSD SIMPLE REVIEW v.3 03/19/2024 REQUIRES RESUBMIT Review Details
04/09/2024 RESTAMP - COMMERCIAL v.1 04/09/2024 APPROVED Review Details
08/23/2023 COMMERCIAL PDSD SIMPLE REVIEW v.1 08/23/2023 REQUIRES RESUBMIT Review Details
03/22/2024 COMMERCIAL PDSD SIMPLE REVIEW v.4 04/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0823-02029
Permit Status: Issued
Permit Description: Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. Tarlton Ferrin, the TW PM, was advised that PDSD permit would be waived and this Commercial Trade Permit application is needed instead. NOTE: Please note we checked "Commercial/Industrial Building" for Structure Type because a choice was required but is not fully appliable to the project.
Total Outstanding Activity Conditions - 4
Date Name
02/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/05/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/05/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Documents

File Name Document Type  
CONS-CAVSARP PLAN SET - REV 1-032124_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CAVSARP PLAN SET - REV 1-032124_V3.PDF DOCUMENTS VIEW
CONS-CAVSARP PLAN SET - REV 1-032124_V3.PDF DOCUMENTS VIEW