Permits

Address: 12635 W MILE WIDE RD
Date - 08/17/2026 12:57 a.m.
Total Number Of Permits - (8)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-1225-02182 Submitted 12/04/2025 N/A Commercial Building This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
TD-DEV-1225-00300 Submitted 12/04/2025 N/A Development Package This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
TC-COM-1125-02098 Issued 11/13/2025 06/28/2026 Commercial Building This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
TC-COM-0823-02029 Issued 08/21/2023 04/15/2026 Commercial Building Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client. Tarlton Ferrin, the TW PM, was advised that PDSD permit would be waived and this Commercial Trade Permit application is needed instead. NOTE: Please note we checked "Commercial/Industrial Building" for Structure Type because a choice was required but is not fully appliable to the project.
TR-UTL-0823-02308 Void 08/17/2023 N/A Right-of-Way (ROW) - Utility Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client.
TD-DEV-0823-00348 Void 08/07/2023 08/06/2024 Development Package VOID - Application was rejected at OK's to submit and customer was told to apply for a utility permit - Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design focuses on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) is providing design services for the project. Tucson Water is the owner and the client.
TW-CONS-0426-0051 Inspections 04/16/2026 N/A TW CIP Planning & Engineering PJW947, Package II, Construction-E, KE&G scope includes RB-101 and RB-105 for this permit.
TW-CONS-0426-0050 Inspections 04/06/2026 N/A TW CIP Planning & Engineering Herman's scope includes RB-104, RB-107 and RB 108 for this permit.

Plans

Address: 12635 W MILE WIDE RD
Date - 08/17/2026 12:57 a.m.
Total Number Of Plans - (5)
Plan Number Status Application Date Exp Date Unit Type Description
CIP-0324-00004 In Review 03/06/2024 N/A -- (CIP) Commercial Structure
CIP-0924-00033 In Review 09/13/2024 N/A -- (CIP) Commercial Structure This is a Tucson Water Capital Improvement Project on City Property but in the County. We are upgrading existing equipment (no new buildings). There is piping, structural and electrical elements. This is the next phase of this project. For the first 4 basins we were instructed to apply for a commercial trade permit (Permit Number: TC-COM-0823-02029). We are now working towards a similar permit for the remaining 6 basins. We would like to use the CIP Energov workflow to get review comments now (if any) while during the design phase. With questions please reach out to Tarlton Ferrin, tarlton.ferrin@tucsonaz.gov 520-837-9151
TP-PRE-0523-00227 Complete 05/31/2023 N/A -- Pre-Application Conference Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design will focus on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) will provide design services for the project. Tucson Water is the owner and the client.
TW-PLAN-0426-0082 Administrative Processing 04/03/2026 N/A -- TW Capital Plan CAVSARP MOV sites 101 & 105 are nearing completion. KE&G is reporting that they will have their work finished on the Aug 19th, 2026.
TW-PLAN-0526-0118 In Review 05/08/2026 N/A -- TW Capital Plan This plan set is for RB-109 and RB-110 for the Pressure Relief Valve bypass piping and instrumentation.