Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel13817032B
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/19/2025 6:50 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 13817032B
Date - 12/19/2025 6:50 p.m.
Total Number Of Permits - (89)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0125-00184 Void 01/28/2025 N/A BLDG 1 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A BLDG 2 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A BLDG 3 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1101 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1102 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1103 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1104 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1105 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2101 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2102 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2103 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2104 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2105 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3101 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3102 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3103 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3104 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3105 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0225-00230 Issued 02/04/2025 12/15/2025 UNIT 1101 Commercial Building Remove the exist evaporative cooler, replace with heat pump package unit. Structural changes is cut 14 inch hole in the roof & 20x20 opening in the hallway ceiling for new return flex duct. Heat pump unit & curb will be installed where the evaporative cooler is currently. Electrically tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0225-00231 Issued 02/04/2025 12/15/2025 UNIT 1102 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0225-00233 Issued 02/04/2025 12/15/2025 UNIT 1103 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0225-00234 Issued 02/04/2025 12/15/2025 UNIT 1104 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0225-00235 Issued 02/04/2025 12/15/2025 UNIT 1105 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-RES-0225-00664 Void 02/04/2025 N/A BLDG 1 Residential Building - One or Two Family VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00230. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-RES-0225-00664 Void 02/04/2025 N/A UNIT 1101 Residential Building - One or Two Family VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00230. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-RES-0225-00665 Void 02/04/2025 N/A BLDG 1 Residential Building - One or Two Family VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00231. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-RES-0225-00665 Void 02/04/2025 N/A UNIT 1102 Residential Building - One or Two Family VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00231. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00913 Issued 05/05/2025 01/04/2026 BLDG 2 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00913 Issued 05/05/2025 01/04/2026 UNIT 2101 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00914 Issued 05/05/2025 01/04/2026 BLDG 2 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00914 Issued 05/05/2025 01/04/2026 UNIT 2102 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00915 Issued 05/05/2025 01/04/2026 BLDG 2 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00915 Issued 05/05/2025 01/04/2026 UNIT 2103 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00916 Issued 05/05/2025 01/04/2026 BLDG 2 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00916 Issued 05/05/2025 01/04/2026 UNIT 2104 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00917 Issued 05/05/2025 02/03/2026 BLDG 2 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00917 Issued 05/05/2025 02/03/2026 UNIT 2105 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00918 Issued 05/05/2025 01/04/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00918 Issued 05/05/2025 01/04/2026 UNIT 3101 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00919 Issued 05/05/2025 01/04/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00919 Issued 05/05/2025 01/04/2026 UNIT 3102 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00920 Issued 05/05/2025 01/04/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00920 Issued 05/05/2025 01/04/2026 UNIT 3103 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00921 Issued 05/05/2025 01/04/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00921 Issued 05/05/2025 01/04/2026 UNIT 3104 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00922 Issued 05/05/2025 01/25/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00922 Issued 05/05/2025 01/25/2026 UNIT 3105 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T05BU02783 Withdrwn 11/21/2005 N/A WALL/FEN WALL:FENCE 900 LF OF 7'HIGH
T11EL00129 Final 01/13/2011 07/18/2011 #2105 ELECT RECONNECT:ELECTRIC:APT
T12CM00651 Final 02/24/2012 09/16/2012 #3104 COMBO ELECTRIC:RECONNECT:APT
T20RW02068 Final 04/10/2020 09/13/2020 ROW From the TEP pole East of 330 E Corona Rd, begin 854' aerial overlash adding 288ct fiber, heading East, continue 1389' aerial overlash heading South to out of ROW 05/15/2020 - PLAN CHANGE - R1- From the TEP pole East of 330 E Corona Rd, riser down and begin 854' trench/bore, placing 2-2'' conduit , heading East, continue 40' trench/bore heading South, riser up and begin 1349' aerial overlash heading South to out of ROW 06/18/202- - PLAN CHANGE R2 From the TEP pole East of 330 E Corona Rd, riser down and begin 854' trench/bore, placing 2-2'' conduit , heading East, continue 40' trench/bore heading South, riser up and begin 255' aerial overlash, riser down and begin 262' trench/bore heading South to out of ROW NOTES: Nogales Hwy was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. Maintain Ingress/ Egress access off of Corona Rd. and also along Nogales Hwy, for the business at 7130 S. Nogales Hwy

Code Enforcement

Parcel Number - 13817032B
Date - 12/19/2025 6:50 p.m.
Total Number Of Code Cases - 3
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1024-04305 Closed - resolved 10/25/2024 01/27/2025 Code Enforcement Case REFS/ Trash,debris and furniture all in front of property
T00VL00559 Complian 05/01/2000 N/A CODEVIOL COMPLAINT: EMERGENCY CALLOUT DUE TO AUTO IN BLDG.
T03DV00596 Complian 07/03/2003 N/A DNR_VIOL COMPLAINT:MIN HOUSING-HOLE IN BATHTUB