Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 330 E CORONA RD
Search
Parcel Attributes
| Parcel | 13817032B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 330 E CORONA RD
Date - 12/19/2025 6:50 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 330 E CORONA RD
Date - 12/19/2025 6:50 p.m.
Total Number Of Permits - (70)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TC-COM-0525-00913 | Issued | 05/05/2025 | 01/04/2026 | BLDG 2 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00913 | Issued | 05/05/2025 | 01/04/2026 | UNIT 2101 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00914 | Issued | 05/05/2025 | 01/04/2026 | BLDG 2 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00914 | Issued | 05/05/2025 | 01/04/2026 | UNIT 2102 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00915 | Issued | 05/05/2025 | 01/04/2026 | BLDG 2 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00915 | Issued | 05/05/2025 | 01/04/2026 | UNIT 2103 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00916 | Issued | 05/05/2025 | 01/04/2026 | BLDG 2 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00916 | Issued | 05/05/2025 | 01/04/2026 | UNIT 2104 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00917 | Issued | 05/05/2025 | 02/03/2026 | BLDG 2 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00917 | Issued | 05/05/2025 | 02/03/2026 | UNIT 2105 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00918 | Issued | 05/05/2025 | 01/04/2026 | BLDG 3 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00918 | Issued | 05/05/2025 | 01/04/2026 | UNIT 3101 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00919 | Issued | 05/05/2025 | 01/04/2026 | BLDG 3 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00919 | Issued | 05/05/2025 | 01/04/2026 | UNIT 3102 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00920 | Issued | 05/05/2025 | 01/04/2026 | BLDG 3 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00920 | Issued | 05/05/2025 | 01/04/2026 | UNIT 3103 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00921 | Issued | 05/05/2025 | 01/04/2026 | BLDG 3 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00921 | Issued | 05/05/2025 | 01/04/2026 | UNIT 3104 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00922 | Issued | 05/05/2025 | 01/25/2026 | BLDG 3 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00922 | Issued | 05/05/2025 | 01/25/2026 | UNIT 3105 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0225-00230 | Issued | 02/04/2025 | 12/15/2025 | UNIT 1101 | Commercial Building | Remove the exist evaporative cooler, replace with heat pump package unit. Structural changes is cut 14 inch hole in the roof & 20x20 opening in the hallway ceiling for new return flex duct. Heat pump unit & curb will be installed where the evaporative cooler is currently. Electrically tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0225-00231 | Issued | 02/04/2025 | 12/15/2025 | UNIT 1102 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0225-00233 | Issued | 02/04/2025 | 12/15/2025 | UNIT 1103 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0225-00234 | Issued | 02/04/2025 | 12/15/2025 | UNIT 1104 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0225-00235 | Issued | 02/04/2025 | 12/15/2025 | UNIT 1105 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-RES-0225-00664 | Void | 02/04/2025 | N/A | BLDG 1 | Residential Building - One or Two Family | VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00230. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-RES-0225-00664 | Void | 02/04/2025 | N/A | UNIT 1101 | Residential Building - One or Two Family | VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00230. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-RES-0225-00665 | Void | 02/04/2025 | N/A | BLDG 1 | Residential Building - One or Two Family | VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00231. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-RES-0225-00665 | Void | 02/04/2025 | N/A | UNIT 1102 | Residential Building - One or Two Family | VOID: OS - Duplicate/Same scope of work as existing application permit TC-COM-0225-00231. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. The scope of work and building type require that this request be submitted under a Commercial Addition/Alteration Permit. This permit will be voided. Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | BLDG 1 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | BLDG 2 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | BLDG 3 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1101 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1102 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1103 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1104 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1105 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2101 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2102 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2103 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2104 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2105 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3101 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3102 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3103 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3104 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3105 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| T05BU02783 | WITHDRWN | 11/21/2005 | N/A | WALL/FEN | WALL:FENCE 900 LF OF 7'HIGH | |
| T11EL00129 | FINAL | 01/13/2011 | 07/18/2011 | #2105 | ELECT | RECONNECT:ELECTRIC:APT |
| T12CM00651 | FINAL | 02/24/2012 | 09/16/2012 | #3104 | COMBO | ELECTRIC:RECONNECT:APT |
| T20RW02068 | FINAL | 04/10/2020 | 09/13/2020 | ROW | From the TEP pole East of 330 E Corona Rd, begin 854' aerial overlash adding 288ct fiber, heading East, continue 1389' aerial overlash heading South to out of ROW 05/15/2020 - PLAN CHANGE - R1- From the TEP pole East of 330 E Corona Rd, riser down and begin 854' trench/bore, placing 2-2'' conduit , heading East, continue 40' trench/bore heading South, riser up and begin 1349' aerial overlash heading South to out of ROW 06/18/202- - PLAN CHANGE R2 From the TEP pole East of 330 E Corona Rd, riser down and begin 854' trench/bore, placing 2-2'' conduit , heading East, continue 40' trench/bore heading South, riser up and begin 255' aerial overlash, riser down and begin 262' trench/bore heading South to out of ROW NOTES: Nogales Hwy was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. Maintain Ingress/ Egress access off of Corona Rd. and also along Nogales Hwy, for the business at 7130 S. Nogales Hwy |
Code Enforcement
Address: 330 E CORONA RD
Date - 12/19/2025 6:50 p.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1024-04305 | Closed - Resolved | 10/25/2024 | 01/27/2025 | REFS/ Trash,debris and furniture all in front of property |