Permit: TC-COM-0525-00919
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
330 E CORONA RD BLDG 3
Address NEW:
330 E CORONA RD BLDG 3
Apply Date:
05/05/2025
Applicant:
Matthew Uselton
Description:
Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Permit Reviews
Permit Number - TC-COM-0525-00919
Permit Status: Inspections
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/09/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/03/2025 | APPROVED |
| 07/08/2025 | RESTAMP - COMMERCIAL v.1 | 07/08/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-00919
Permit Status: Inspections
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/02/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 06/02/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
Conditions
Permit Number - TC-COM-0525-00919
Permit Status: Inspections
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
| Date | Description | Comments |
|---|---|---|
| 06/05/2025 | Please identify the individual unit number associated with this permit in the address section on the construction plan |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00919
Permite Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 7-27-26: not applicable. |
| 07/27/2026 | COT - FCON - Fire - Final | N/A | Not Applicable | |
| 07/27/2026 | COT - LCBU - Building Final | N/A | Re-inspection required | 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted |
| 07/27/2026 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted |
| 07/27/2026 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted |
| 07/27/2026 | COT - LCBU - Framing | N/A | Not Applicable | 7-27-26: not applicable. |
| 07/27/2026 | COT - LCME - Mechanical Intermediate | N/A | Re-inspection required | 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00919
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2026 | TRSP - ROW - Final/Close-Out | Passed |