Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
330 E CORONA RD BLDG 2
Apply Date:
05/05/2025
Applicant:
Matthew Uselton
Description:
Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.

Permit Reviews

Permit Number - TC-COM-0525-00914
Permit Status: Inspections
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Start Date Submittal Complete Date Status  
07/08/2025 RESTAMP - COMMERCIAL v.1 07/08/2025 APPROVED Review Details
05/09/2025 COMMERCIAL REVIEW - FULL v.1 06/03/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0525-00914
Permit Status: Inspections
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Total Outstanding Activity Conditions - 2
Date Name
06/02/2025 AIR BALANCING REPORT IS REQUIRED.
06/02/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-COM-0525-00914
Permit Status: Inspections
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Date Description Comments
06/05/2025 Please identify the individual unit number associated with this permit in the address section on the construction plan

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0525-00914
Permite Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
07/27/2026 COT - BULD - SWG Clearance N/A Not Applicable 7-27-26: not applicable.
07/27/2026 COT - FCON - Fire - Final N/A Not Applicable
07/27/2026 COT - LCBU - Building Final N/A Re-inspection required 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted
07/27/2026 COT - LCEL - Electrical Final N/A Re-inspection required 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted
07/27/2026 COT - LCME - Mechanical Final N/A Re-inspection required 7-27-26: paint all PVC at rooftop, label disconnects at rooftop-identify purpose and circuit, missing GFCI weather resistant receptacles at rooftop ("heavy duty-while in use" receptacle bubble covers will be required where new receptacles are to be installed), submit a new updated panel schedule to the city for review & approval. No access to unit-Additional items may be noted
07/27/2026 COT - LCBU - Framing N/A Not Applicable 7-27-26: not applicable.
07/27/2026 COT - LCME - Mechanical Intermediate N/A Re-inspection required 7-27-26: no access to unit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0525-00914
Permit Description: Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/27/2026 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
2_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_330 EAST CORONA ROAD ROOF REVIEW LETTER AND CALCULATION PACKAGE_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET 330 E CORONA_V1.PDF DOCUMENTS VIEW