Parcel Search: 12315031B
Parcel Search
Parcel Attributes
| Parcel | 12315031B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 3 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 9:25 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 08/17/2026 9:25 a.m.
Total Number Of Rezone Cases - (2)
Permits
Parcel Number - 12315031B
Date - 08/17/2026 9:25 a.m.
Total Number Of Permits - (81)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 1 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 10 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 11 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 12 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 13 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 14 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 2 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 3 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 4 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 5 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 6 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 7 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 8 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 9 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| T20CM01526 | Expired | 03/05/2020 | N/A | Commercial Building | W - SWITCH EVAP COOLERS TO ROOFTOP AC UNITS | |
| TC-COM-0424-00631 | Issued | 04/09/2024 | 10/12/2024 | UNIT C | Commercial Building | Replace gas line from gas meter to HVAC & Water heater |
| TC-COM-0425-00826 | Withdrawn | 04/24/2025 | N/A | UNIT G | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANELS IN UNITS: |
| TC-COM-0425-00827 | Withdrawn | 04/24/2025 | N/A | UNIT H | Commercial Building | https://cityoftucsonaz-energovweb.tylerhost.net/apps/selfservice#/permit/8735f4c1-9214-4bb2-9a87-a268305b7abc/THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANELS IN UNITS: |
| TC-COM-0525-00899 | Inspections | 05/05/2025 | 01/28/2026 | UNIT G | Commercial Building | SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT G |
| TC-COM-0525-00900 | Inspections | 05/05/2025 | 12/17/2025 | UNIT H | Commercial Building | SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT H |
| TC-COM-0625-01235 | Issued | 06/25/2025 | 10/08/2026 | UNIT 3 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01237 | Issued | 06/25/2025 | 10/08/2026 | UNIT 5 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01238 | Issued | 06/25/2025 | 10/08/2026 | UNIT 6 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01239 | Issued | 06/25/2025 | 10/08/2026 | UNIT 9 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 LCBU - Roof Nailing |
| TC-COM-0625-01240 | Void | 06/25/2025 | N/A | UNIT 9 | Commercial Building | VOIDED - DUPLICATE PERMIT, CONTINUE WITH EXISTING PERMIT TC-COM-0625-01239 THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-COM-0625-01241 | Issued | 06/25/2025 | 10/08/2026 | UNIT 12 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 .30000.00 |
| TC-COM-0625-01242 | Issued | 06/25/2025 | 10/08/2026 | UNIT 13 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01243 | Issued | 06/25/2025 | 10/08/2026 | UNIT 14 | Commercial Building | HE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 .30000.00 |
| TC-COM-0625-01244 | Issued | 06/25/2025 | 10/08/2026 | UNIT 15 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01245 | Issued | 06/25/2025 | 10/08/2026 | UNIT 16 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01246 | Issued | 06/25/2025 | 10/08/2026 | UNIT 17 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01247 | Issued | 06/25/2025 | 10/08/2026 | UNIT 18 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. |
| TC-COM-0625-01249 | Issued | 06/25/2025 | 10/08/2026 | UNIT 19 | Commercial Building | HE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01250 | Issued | 06/25/2025 | 04/01/2026 | UNIT 20 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01251 | Issued | 06/25/2025 | 10/08/2026 | UNIT 21 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01252 | Issued | 06/25/2025 | 10/08/2026 | UNIT 22 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01253 | Issued | 06/25/2025 | 10/08/2026 | UNIT 24 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01254 | Issued | 06/25/2025 | 10/08/2026 | UNIT 27 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01255 | Issued | 06/25/2025 | 10/08/2026 | UNIT 28 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01256 | Issued | 06/25/2025 | 10/08/2026 | UNIT B | Commercial Building | HE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS B,E,F,J,K.30000.00 |
| TC-COM-0625-01257 | Issued | 06/25/2025 | 10/08/2026 | UNIT E | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS B,E,F,J,K. 30000.00 |
| TC-COM-0625-01258 | Issued | 06/25/2025 | 10/08/2026 | UNIT F | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS B,E,F,J,K30000.00 |
| TC-COM-0625-01259 | Issued | 06/25/2025 | 10/08/2026 | UNIT J | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS B,E,F,J,K 30000.00 |
| TC-COM-0625-01260 | Issued | 06/25/2025 | 10/08/2026 | UNIT K | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS B,E,F,J,K 30000.00 |
| TC-RES-0625-03215 | Void | 06/25/2025 | N/A | UNIT 3 | Residential Building - One or Two Family | *VOID: Wrong Permit Type.* -- THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. |
| TC-RES-0625-03216 | Void | 06/25/2025 | N/A | UNIT 5 | Residential Building - One or Two Family | *VOID: wrong permit type.* -- THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-RES-0625-03217 | Void | 06/25/2025 | N/A | UNIT 6 | Residential Building - One or Two Family | VOID: Wrong Permit Type. We were unable to intake your request for gas, electric and cooling under a Residential Addition Alteration Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Additionally you will need to submit separate commercial permits for each unit. For questions: Building_Official@tucsonaz.gov THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-RES-0625-03219 | Void | 06/25/2025 | N/A | UNIT 9 | Residential Building - One or Two Family | VOID: Wrong Permit Type. We were unable to intake your request for gas, electric and cooling under a Residential Addition Alteration Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Additionally you will need to submit separate commercial permits for each unit. For questions: Building_Official@tucsonaz.gov THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-COM-0725-01426 | Inspections | 07/29/2025 | 02/04/2026 | UNIT 10 | Commercial Building | Replace black steel gas line from gas meter to existing water heater, stove & HVAC. |
| TC-COM-1023-02362 | Issued | 10/09/2023 | 04/29/2024 | UNIT 2 | Commercial Building | UNIT#2 - replace 34' of 3/4" black steel to go from existing gas meter to HVAC unit |
| TC-COM-1023-02363 | Issued | 10/09/2023 | 04/29/2024 | UNIT 8 | Commercial Building | UNIT#8 - Install 35' of 3/4" black steel from existing gas meter to HVAC unit |
| TC-COM-1023-02364 | Issued | 10/09/2023 | 04/29/2024 | UNIT 11 | Commercial Building | UNIT# 11 - Install 22' of 3/4" black steel piping from existing meter to HVAC unit |
| TC-COM-1023-02365 | Issued | 10/09/2023 | 04/29/2024 | UNIT 23 | Commercial Building | UNIT#23 - Install 24' of 3/4" black steel piping from existing meter to HVAC unit |
| TC-COM-1023-02366 | Withdrawn | 10/09/2023 | 04/06/2024 | Commercial Building | UNIT#25 - Install 30' of 3/4" black steel piping from existing meter to HVAC unit | |
| TC-COM-1023-02367 | Issued | 10/09/2023 | 04/29/2024 | UNIT 26 | Commercial Building | UNIT#26 - Install 28' of 3/4" black steel piping from existing gas meter to HVA unit |
| TC-COM-1024-02011 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT A | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02012 | Withdrawn | 10/21/2024 | 04/19/2025 | UNIT B | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02013 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT C | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02014 | Inspections | 10/21/2024 | 06/09/2025 | UNIT D | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02015 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 1 | Commercial Building | UNIT 1 - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02016 | Inspections | 10/21/2024 | 12/29/2025 | UNIT 2 | Commercial Building | UNIT 2 - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02018 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT D | Commercial Building | UNIT D - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02019 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 7 | Commercial Building | UNIT 7 - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02020 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 8 | Commercial Building | UNIT 8 - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02021 | Inspections | 10/21/2024 | 02/04/2026 | UNIT 10 | Commercial Building | UNIT 10 - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02022 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 11 | Commercial Building | UNIT 11 - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02023 | Inspections | 10/21/2024 | 12/29/2025 | UNIT I | Commercial Building | UNIT I - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02024 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 23 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02025 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 25 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02026 | Inspections complete | 10/21/2024 | 12/29/2025 | UNIT 26 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1124-02156 | Complete | 11/08/2024 | 07/02/2025 | UNIT 10 | Commercial Building | Install 36FT of 3/4" black steel gas piping from meter to HVAC |
| TC-COM-1124-02157 | Complete | 11/08/2024 | 07/02/2025 | UNIT I | Commercial Building | Install new 56FT 3/4" black steel gas line from meter to HVAC |
| TC-RES-1124-06513 | Void | 11/08/2024 | 05/07/2025 | UNIT I | Residential Building - One or Two Family | VOID: OS – Wrong Permit Type. We were unable to process your request under a Residential Trade Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Installed new 3/4" 56FT gas line from meter to HVAC unit. |
| TC-RES-1124-06514 | Void | 11/08/2024 | 05/07/2025 | UNIT 10 | Residential Building - One or Two Family | VOID: OS – Wrong Permit Type. We were unable to process your request under a Residential Trade Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Install new 36FT 3/4" gas line from meter to HVAC unit. |
| TC-COM-1122-00128 | Issued | 11/16/2022 | 06/07/2023 | UNIT A | Commercial Building | Replace 3/4" gas line from HVAC unit to meter. Approx. 25 FT |
| TC-COM-1122-00129 | Issued | 11/16/2022 | 06/07/2023 | UNIT 25 | Commercial Building | Replace 3/4" gas line from HVAC unit to gas meter approx. 30FT |
| TC-COM-1224-02376 | Void | 12/20/2024 | N/A | UNIT 1 | Commercial Building | VOIDED WRONG PERMIT TYPE Gas Line repair |
| TC-COM-1224-02377 | Void | 12/20/2024 | N/A | UNIT 4 | Commercial Building | VOIDED WRONG PERMIT TYPE Gas Line repair |
| TC-COM-1224-02390 | Complete | 12/23/2024 | 07/07/2025 | UNIT 1 | Commercial Building | a gas Line repair |
| TC-COM-1224-02391 | Complete | 12/23/2024 | 07/07/2025 | UNIT 4 | Commercial Building | A gas line repair |
| T18CM00637 | Final | 01/25/2018 | 07/28/2018 | #7 | COMBO | REPAIR/REPL GAS LINE |
Code Enforcement
Parcel Number - 12315031B
Date - 08/17/2026 9:25 a.m.
Total Number Of Code Cases - 2
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T06DV02269 | Noverify | 11/22/2006 | N/A | DNR_VIOL | WITNESS CLAIMS ILLEGAL DUMPING OF WATER HEATER, COOLER SKELTON, FURNITURE AND OTHER DEBRIS BY YELLOW 76 CHEVY PU AZ LICENSE # 080 TYP. HISPANIC MALE IN MID 40'S | |
| T08DV11541 | Complian | 12/26/2008 | N/A | DNR_VIOL | APARTMENT #26 COMMUNICATIONS NON-EMERGENCY CALL. CAR THROUGH BUILDING. SMALL CRACK IN BLOCK WALL UNDER WINDOW. |