Permit: TC-COM-1024-02011
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
707 E LEE ST UNIT A
Address NEW:
707 E LEE ST UNIT A
Apply Date:
10/21/2024
Applicant:
Alexander Lee
Description:
THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL
Permit Reviews
Permit Number - TC-COM-1024-02011
Permit Status: Inspections complete
Permit Description: THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/25/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 11/26/2024 | APPROVED |
| 10/23/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 11/07/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1024-02011
Permit Status: Inspections complete
Permit Description: THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL
| Date | Description | Comments |
|---|---|---|
| 10/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-02011
Permite Description: THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2024 | COT - BULD - SWG Clearance | N/A | Re-inspection required | 12-27-24, gauge must be pressurized to 15 psi for a minimum of 10 minutes. |
| 12/27/2024 | COT - HCBU - TCO | N/A | Re-inspection required | 12-27-24, not ready. Electrical & mechanical work was made to units without inspection. Contractor must submit letters to the city for review indicating that work was done per approved plans and meets the 2018 IRC requirements. |
| 12/11/2024 | COT - LCBU - Building Final | N/A | Not Ready | |
| 12/11/2024 | COT - LCEL - Electrical Final | N/A | Not Ready | |
| 12/11/2024 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 12/27/2024 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | 12-27-24, per contractor, electrical work was made to unit but never inspected prior to being covered up. Contractor must submit a letter to the city for review indicating that work was done per approved plans and meets 2018 IRC requirements. |
| 12/27/2024 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | 12-27-24, per contractor, electrical work was made to unit but never inspected prior to being covered up. Contractor must submit a letter to the city for review indicating that work was done per approved plans and meets 2018 IRC requirements. |
| 12/27/2024 | COT - LCME - Mechanical Above Ceiling | N/A | Not Ready | 12-27-24, per contractor, duct work was made to unit but never inspected prior to being covered up. Contractor must submit a letter to the city for review indicating that work was done per approved plans and meets 2018 IRC requirements. |
| 12/27/2024 | COT - LCME - Mechanical Intermediate | N/A | Not Ready | 12-27-24, per contractor, duct work was made to unit but never inspected prior to being covered up. Contractor must submit a letter to the city for review indicating that work was done per approved plans and meets 2018 IRC requirements. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-02011
Permit Description: THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2024 | BULD - Electrical Clearance | Passed | ||
| 12/11/2024 | COT - FCON - Fire - Final | Passed | air conditioning units only | |
| 12/11/2024 | ENGR Engineering Final | Passed | ||
| 12/11/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 12/11/2024 | COT - LCBU - Roof Nailing | Passed | ||
| 07/02/2025 | COT - BULD - SWG Clearance | Passed | Ok to reconnect service. | |
| 07/02/2025 | COT - HCBU - TCO | Passed | No TCO required. Ok to occupy. | |
| 07/02/2025 | COT - LCBU - Building Final | Passed | ||
| 07/02/2025 | COT - LCEL - Electrical Final | Passed | ||
| 07/02/2025 | COT - LCME - Mechanical Final | Passed | ||
| 07/02/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 07/02/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 07/02/2025 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 07/02/2025 | COT - LCME - Mechanical Intermediate | Passed |