Address Search: 715 E LEE ST
Search
Parcel Attributes
| Parcel | 12315031B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 3 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 715 E LEE ST
Date - 08/18/2026 8:08 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 08/18/2026 8:08 a.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-73-04 | Ashton - Goodman - 1st Avenue | R-3 | Effectuated | 07/27/2011 |
Permits
Address: 715 E LEE ST
Date - 08/18/2026 8:08 a.m.
Total Number Of Permits - (55)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1224-02390 | Complete | 12/23/2024 | 07/07/2025 | UNIT 1 | Commercial Building | a gas Line repair |
| TC-COM-1224-02391 | Complete | 12/23/2024 | 07/07/2025 | UNIT 4 | Commercial Building | A gas line repair |
| TC-COM-1122-00129 | Issued | 11/16/2022 | 06/07/2023 | UNIT 25 | Commercial Building | Replace 3/4" gas line from HVAC unit to gas meter approx. 30FT |
| TC-COM-1124-02156 | Complete | 11/08/2024 | 07/02/2025 | UNIT 10 | Commercial Building | Install 36FT of 3/4" black steel gas piping from meter to HVAC |
| TC-RES-1124-06513 | Void | 11/08/2024 | 05/07/2025 | UNIT I | Residential Building - One or Two Family | VOID: OS – Wrong Permit Type. We were unable to process your request under a Residential Trade Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Installed new 3/4" 56FT gas line from meter to HVAC unit. |
| TC-COM-1024-02023 | Inspections | 10/21/2024 | 12/29/2025 | UNIT I | Commercial Building | UNIT I - THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02024 | Inspections Complete | 10/21/2024 | 12/29/2025 | UNIT 23 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02025 | Inspections Complete | 10/21/2024 | 12/29/2025 | UNIT 25 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1024-02026 | Inspections Complete | 10/21/2024 | 12/29/2025 | UNIT 26 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLERS WITH PACKAGE ROOF TOP HEAT PUMPS AND UPGRADING ELECTRIC PANEL |
| TC-COM-1023-02362 | Issued | 10/09/2023 | 04/29/2024 | UNIT 2 | Commercial Building | UNIT#2 - replace 34' of 3/4" black steel to go from existing gas meter to HVAC unit |
| TC-COM-1023-02363 | Issued | 10/09/2023 | 04/29/2024 | UNIT 8 | Commercial Building | UNIT#8 - Install 35' of 3/4" black steel from existing gas meter to HVAC unit |
| TC-COM-1023-02364 | Issued | 10/09/2023 | 04/29/2024 | UNIT 11 | Commercial Building | UNIT# 11 - Install 22' of 3/4" black steel piping from existing meter to HVAC unit |
| TC-COM-1023-02365 | Issued | 10/09/2023 | 04/29/2024 | UNIT 23 | Commercial Building | UNIT#23 - Install 24' of 3/4" black steel piping from existing meter to HVAC unit |
| TC-COM-1023-02366 | Withdrawn | 10/09/2023 | 04/06/2024 | Commercial Building | UNIT#25 - Install 30' of 3/4" black steel piping from existing meter to HVAC unit | |
| TC-COM-1023-02367 | Issued | 10/09/2023 | 04/29/2024 | UNIT 26 | Commercial Building | UNIT#26 - Install 28' of 3/4" black steel piping from existing gas meter to HVA unit |
| TC-COM-0725-01426 | Inspections | 07/29/2025 | 02/04/2026 | UNIT 10 | Commercial Building | Replace black steel gas line from gas meter to existing water heater, stove & HVAC. |
| TC-COM-0625-01235 | Issued | 06/25/2025 | 10/08/2026 | UNIT 3 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01237 | Issued | 06/25/2025 | 10/08/2026 | UNIT 5 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01238 | Issued | 06/25/2025 | 10/08/2026 | UNIT 6 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01239 | Issued | 06/25/2025 | 10/08/2026 | UNIT 9 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 LCBU - Roof Nailing |
| TC-COM-0625-01240 | Void | 06/25/2025 | N/A | UNIT 9 | Commercial Building | VOIDED - DUPLICATE PERMIT, CONTINUE WITH EXISTING PERMIT TC-COM-0625-01239 THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-COM-0625-01241 | Issued | 06/25/2025 | 10/08/2026 | UNIT 12 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 .30000.00 |
| TC-COM-0625-01242 | Issued | 06/25/2025 | 10/08/2026 | UNIT 13 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01243 | Issued | 06/25/2025 | 10/08/2026 | UNIT 14 | Commercial Building | HE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 .30000.00 |
| TC-COM-0625-01244 | Issued | 06/25/2025 | 10/08/2026 | UNIT 15 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-COM-0625-01245 | Issued | 06/25/2025 | 10/08/2026 | UNIT 16 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01246 | Issued | 06/25/2025 | 10/08/2026 | UNIT 17 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01247 | Issued | 06/25/2025 | 10/08/2026 | UNIT 18 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. |
| TC-COM-0625-01249 | Issued | 06/25/2025 | 10/08/2026 | UNIT 19 | Commercial Building | HE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01250 | Issued | 06/25/2025 | 04/01/2026 | UNIT 20 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01251 | Issued | 06/25/2025 | 10/08/2026 | UNIT 21 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01252 | Issued | 06/25/2025 | 10/08/2026 | UNIT 22 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01253 | Issued | 06/25/2025 | 10/08/2026 | UNIT 24 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01254 | Issued | 06/25/2025 | 10/08/2026 | UNIT 27 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 30000.00 |
| TC-COM-0625-01255 | Issued | 06/25/2025 | 10/08/2026 | UNIT 28 | Commercial Building | THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. 30000.00 |
| TC-RES-0625-03215 | Void | 06/25/2025 | N/A | UNIT 3 | Residential Building - One or Two Family | *VOID: Wrong Permit Type.* -- THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28. |
| TC-RES-0625-03216 | Void | 06/25/2025 | N/A | UNIT 5 | Residential Building - One or Two Family | *VOID: wrong permit type.* -- THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-RES-0625-03217 | Void | 06/25/2025 | N/A | UNIT 6 | Residential Building - One or Two Family | VOID: Wrong Permit Type. We were unable to intake your request for gas, electric and cooling under a Residential Addition Alteration Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Additionally you will need to submit separate commercial permits for each unit. For questions: Building_Official@tucsonaz.gov THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| TC-RES-0625-03219 | Void | 06/25/2025 | N/A | UNIT 9 | Residential Building - One or Two Family | VOID: Wrong Permit Type. We were unable to intake your request for gas, electric and cooling under a Residential Addition Alteration Permit. The scope of work and building type require that this request be submitted under a Commercial Trade Permit. This permit will be voided. Additionally you will need to submit separate commercial permits for each unit. For questions: Building_Official@tucsonaz.gov THE SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP, UPGRADING ELECTRIC PANEL AND GAS LINE REPAIR IN UNITS 3, 5, 6, 9, 12,13,14,15,16,17,18,19, 20, 21, 22, 24, 27, 28 |
| T20CM01526 | Expired | 03/05/2020 | N/A | Commercial Building | W - SWITCH EVAP COOLERS TO ROOFTOP AC UNITS | |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 1 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 10 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 11 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 12 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 13 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 14 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 2 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 3 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 4 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 5 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 6 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 7 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 8 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| TC-COM-0125-00128 | Inspections | 01/21/2025 | 08/05/2025 | UNIT 9 | Commercial Building | Installing new gas bonds to meter EXISTING meter packs |
| T18CM00637 | FINAL | 01/25/2018 | 07/28/2018 | #7 | COMBO | REPAIR/REPL GAS LINE |