Permit: TC-COM-0525-00899
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
707 E LEE ST UNIT G
Address NEW:
707 E LEE ST UNIT G
Apply Date:
05/05/2025
Applicant:
Alex Lee
Description:
SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT G
Permit Reviews
Permit Number - TC-COM-0525-00899
Permit Status: Inspections
Permit Description: SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT G
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 05/23/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00899
Permite Description: SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT G
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - HCME - Mechanical Intermediate | N/A | Not Ready | |
| 06/17/2025 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | Registers need to be blocked on three sides and wires are loose without a box to contain them and terminated in the soffit area. Please install a box and make it accessible for any wires that are capped and stowed |
| 06/20/2025 | COT - LCPL - Plumbing Final | N/A | Not Applicable | |
| 07/25/2025 | COT - BULD - SWG Clearance | N/A | Re-inspection required | 7.25.25 Gas line is not under pressure test |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00899
Permit Description: SCOPE OF WORK CONSISTS OF REPLACING EVAPORATIVE COOLER WITH PACKAGE ROOF TOP HEAT PUMP AND UPGRADING ELECTRIC PANEL IN UNIT G
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2025 | COT - FCON - Fire - Final | Passed | ||
| 06/20/2025 | COT - LCBU - Building Final | Passed | ||
| 06/20/2025 | COT - LCEL - Electrical Final | Passed | ||
| 06/20/2025 | COT - LCME - Mechanical Final | Passed | ||
| 06/20/2025 | ENGR Engineering Final | Passed | Site is clean and safe. In accordance with plans. | |
| 08/01/2025 | COT - BULD - SWG Clearance | Passed | Ok to set gas meter and begin service |