Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel11620637A
JurisdictionTucson
City of Tucson ZoningC-2, C-3
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Core, Downtown Infill Incentive District
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Flood Related Information

FEMA Floodplain Area

,

Major Washes

Tucson Registered NeighborhoodMenlo Park
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 01/15/2025 8:27 a.m.
Total Number Of OZC Plans - (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Menlo Park District 949 09/29/1926 None
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 01/15/2025 8:27 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-70-103 Ernest - Congress Street R-3 Denied 07/10/2012 S LINDA

Special Development Requests & Requirements

Date - 01/15/2025 8:27 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Type Description
T21SA00546 Applied N/A
T22SA00245 Complete N/A Zoning Compliance Letter for new Multifamily

Permits

Parcel Number - 11620637A
Date - 01/15/2025 8:27 a.m.
Total Number Of Permits - (30)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-UTL-0123-00039 Submitted 01/10/2023 07/09/2023 Utilities Permit Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units.
TC-COM-0223-00676 Issued 02/21/2023 02/10/2024 Commercial Building Temp power. Power Plus is to provide power to project site using a 800AMP three phase 120/208V system via underground conduit.
TR-ROW-0323-00487 Withdrawn 03/13/2023 N/A Right-of-Way (ROW) water line, sewer line & man hole and street improvements
TR-ROW-0323-00569 Issued 03/29/2023 05/26/2023 Right-of-Way (ROW) Installation of approx. 300 lf of Sewer Line for the Bautista Mixed-Use Project, P22WI00020
TR-ROW-0323-00576 Issued 03/30/2023 02/27/2024 Right-of-Way (ROW) Installation of Water Line for the Bautista Mixed-Use Project
TR-UTL-0424-00717 Complete 04/04/2024 09/22/2024 Right-of-Way (ROW) - Utility Water Line Tap and Water line run
TR-ROW-0423-00625 Complete 04/11/2023 06/30/2023 Right-of-Way (ROW) Install Fiber and Conduit Pathway. 4-days Congress Crossing by Directional Bore. 25-days for Linda Ave conduit install by trench on east side shoulder. 2-days for aerial Cable over lash.
TR-ROW-0423-00633 Issued 04/13/2023 07/13/2023 Right-of-Way (ROW) barricade permit (fence)
TC-COM-0423-01086 Void 04/19/2023 10/16/2023 Commercial Building VOID - Permit applied under wrong Work Class - This is not a New Commercial Building - Garage shoring
DP21-0157 Issued 06/21/2021 09/14/2026 Development Package REV - Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units.
TR-UTL-0724-01310 Issued 07/12/2024 02/14/2025 Right-of-Way (ROW) - Utility 5' x 5' BELL HOLE IN CONCRETE ALONG WITH AN APPROXIMATE 2' X 300' TRENCH IN DIRT/ASPHALT/CONCRETE
TF-FCP-0824-00627 Needs resubmittal 08/06/2024 N/A Fire Construction Permit Modification to approved fire plans changing sidewall heads to pendants
TF-FCP-0824-00682 Void 08/15/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0823-01040 - Modification to existing fire sprinkler permit
TF-FCP-0823-01040 Inspections 08/29/2023 04/24/2025 Fire Construction Permit Installation of fire sprinkler system
TF-FCP-0924-00822 Needs resubmittal 09/23/2024 N/A Fire Construction Permit Installation of fire sprinkler system
TC-COM-1023-02351 Expired 10/05/2023 09/29/2024 Commercial Building New construction of a new 256-unit Multi-Family Housing Project. (Commercial Electrical Scope of Work)
TF-FOP-1122-00006 Complete 11/01/2022 12/13/2023 Fire Operational Permit All Souls special event JH 11/2/22
TF-FCP-1123-01315 Complete 11/15/2023 06/06/2024 Fire Construction Permit Installation of 80' of 8" Ductile Iron Pipe
TF-FCP-1224-01056 Void 12/06/2024 N/A Fire Construction Permit VOID -Submit under Permit#TF-FCP-0823-01040 - Installation of NEW Fire Alarm System in a new Multi-family Project.(Bautista)
TR-UTL-1224-02320 Needs resubmittal 12/09/2024 N/A Right-of-Way (ROW) - Utility TEP install
T21CM09453 Issued 12/12/2021 07/08/2025 Commercial Building New Apartment Building with Underground Parking
T15TUP0002 Withdrwn 03/18/2015 N/A TUP Short term parking of cars, RV's, and shuttle vans. Operation of parking lot.
T16BU00717 Final 05/04/2016 11/05/2016 TENTS TENT
T16FO00091 Final 11/04/2016 05/22/2017 FIREOPER All Souls Procession 11/6
T17FO00922 Final 10/30/2017 11/27/2018 FIREOPER All Souls Procession 11/5/17
T18FO00937 Final 10/30/2018 05/03/2019 FIREOPER All Souls Procession 11/04/18
T19FO00772 Final 09/25/2019 04/02/2020 FIREOPER WEST COAST MUSIC FESTIVAL 10-05 FROM 3:00 TO 10:00PM
T19FO00813 Final 10/07/2019 05/01/2020 FIREOPER All Souls Procession 2019 (at the end of procession) 11.03.19
T20FO00017 Final 01/09/2020 07/29/2020 FIREOPER GEM SHOW - African Art Village - February 2 - 17, 2019 Set-up - January 28, 2019
T21RW04603 Final 10/08/2021 11/08/2021 ROW THE ALL SOULS PROCESSION IS A FREE, HYPER-INCLUSIVE, PATICIPATORY, NON-MOTORIZED MEMORIAL MARCH TO HONOR THOSE WHO HAVE PASSED. THE EVENT SPANS THE WEEKEND WITH ANCILLARY EVENTS, WORKSHOPS AND OTHER FAMILY FRIENDLY ACTIVITIES THAT CULMINATE ON SUNDAY NOVEMBER 7, 2021. NOW IN ITS 32nd YEAR THE PROCESSION TYPICALLY DRAWS OVER 150,000 ATTENDEES. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813

Code Enforcement

Parcel Number - 11620637A
Date - 01/15/2025 8:27 a.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1023-06262 Closed - resolved 10/27/2023 10/30/2023 Code Enforcement Case RWOP- Working outside of permitted time frame, construction is reported to be before sun up.
CE-VIO0124-00414 Closed - resolved 01/29/2024 02/05/2024 Code Enforcement Case Building: Construction noise outside of limits; typically 3-4 am with no Temporary Noise Exemption for those days.

Plans

Parcel Number - 11620637A
Date - 01/15/2025 8:27 a.m.
Total Number Of Plans - 7
Plan Number Plan Status Application Date Expired Date Unit Type Description
S22-062 Complete 09/30/2022 N/A Land Division Mission District, Land Split
T21SA00546 Approved 12/15/2021 N/A Special Districts The Bautista - New apartments, commercial, retail (IID/IPP Application)
TC-BCA-1123-00026 Approved 11/22/2023 N/A Appeal - Building Official Code determination to use non-fire-retardant-treated wood within floor assemblies
TE-BAS-0923-00179 In review 09/05/2023 N/A Basin LEGACY PERMIT BROUGHT IN FROM PRO REV - Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units.
TP-PRE-0924-00210 Needs resubmittal 09/06/2024 N/A Pre-Application This request for a pre-application conference is being submitted on behalf The Gadsden Company and relates to a 12+/- acre property bounded by Congress St on the north, the Santa Cruz River on the east, Cushing St on the south and Avenida del Convento on the west. The property is to be called the Mission District PAD. The property consists of tax assessor parcel numbers 116-20-033A, 6340, 636A, 636B, 637A, 637D and 637C.(Please note some of these parcels did not show up in the add location tab).
T21PRE0091 Closed 04/08/2021 N/A NEIGHBORHOOD NOTIFICATION Site/Grading/IID/Floodplain - Bautista Plaza.
T21PRE0272 Plan ck 12/21/2021 N/A NEIGHBORHOOD NOTIFICATION