Permit: TR-ROW-0326-00364
Permit Details
Apply Date:
03/30/2026
Applicant:
Deno Sereni
Description:
Repave section of Linda Ave from Zanjeros to the South side of the project at approximately Calle de Los Higos, Seal and re-stripe from South side of the project to Cushing St.
Permit Reviews
Permit Number - TR-ROW-0326-00364
Permit Status: In review
Permit Description: Repave section of Linda Ave from Zanjeros to the South side of the project at approximately Calle de Los Higos, Seal and re-stripe from South side of the project to Cushing St.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/31/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00364
Permit Status: In review
Permit Description: Repave section of Linda Ave from Zanjeros to the South side of the project at approximately Calle de Los Higos, Seal and re-stripe from South side of the project to Cushing St.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/03/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 04/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/03/2026 | We have streetcar lines that run along this location. Sunlink will determine if there are any additional requirements for your request. This is done by a track access request using the following link: https://www.suntran.com/wp-content/uploads/2025/07/Track-Access-Permit-Request_Rev06-20220520.pdf |
| 04/06/2026 | The following extended traffic control set-up times were approved: Night Work Closures only |
| 04/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |