Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 10709007C
Parcel Search
Parcel Attributes
| Parcel | 10709007C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Miracle Manor |
| Major Street & Route | Gateway Route |
| National Register Historic District | Miracle Mile Historic District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/13/2025 10:54 p.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 10709007C
Date - 12/13/2025 10:54 p.m.
Total Number Of Permits - (28)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TF-FCP-0125-00035 | Expired | 01/15/2025 | 07/28/2025 | Fire Construction Permit | Installation of New Manual and Automatic Fire Alarm Sytem in a New Building. | |
| TF-FCP-0125-00036 | Inspections | 01/16/2025 | 03/23/2026 | BLDG 4 | Fire Construction Permit | Installation of a CaptiveAire TANK fire suppression system for a kitchen hood. |
| TC-COM-0124-00136 | Inspections | 01/22/2024 | 05/12/2026 | BLDG 1 | Commercial Building | Structural Foundation and Superstructure Plans for the Chapel Building. Site utilities, grading, and drainage plans per Developemnt Package, |
| TF-FCP-0125-00066 | Void | 01/22/2025 | N/A | BLDG 4 | Fire Construction Permit | 4/8/25 VOID - Per Alicia Simmons w/Concord General - Kitchen Hood Suppression System |
| TC-COM-0225-00339 | Inspections | 02/17/2025 | 06/09/2026 | BLDG 2 | Commercial Building | Core and Shell and Interior Fitout Plans for the Staff Living Building No 2. |
| TR-ROW-0425-00450 | Inspections | 04/04/2025 | 07/31/2025 | Right-of-Way (ROW) | Digging into 50 LF in AC and 50 LF in dirt for new water lines into property (06/30/2025)Renew 30 days of 07/01/2025 new expiration 07/31/2025 | |
| TC-COM-0525-00978 | Approved | 05/13/2025 | N/A | BLDG 1 | Commercial Building | Foundation, Superstructure, Core and Shell Plans for the Exterior Canopy |
| TR-ROW-0725-00949 | Inspections | 07/24/2025 | 10/30/2025 | Right-of-Way (ROW) | Digging into 50 LF in AC and 50 LF in dirt for new water lines into property (Original permit ##TR-ROW-0425-00450) | |
| TC-COM-0824-01531 | Issued | 08/06/2024 | 06/03/2026 | BLDG 4 | Commercial Building | Building 4 - Phase 3 and 4, Core and Shell and Interior Fit-out. The Foundations and Super Structure were approved under Permit TC-COM-1023-02486 |
| TC-COM-0824-01675 | Issued | 08/27/2024 | 03/16/2026 | BLDG 3 | Commercial Building | Core and Shell and Interior Fitout Plans for the Administration Building No 3. |
| TD-DEV-0923-00385 | Issued | 09/01/2023 | 10/09/2028 | Development Package | Rev 1 - submitted 10.23.2025 - Update to landscaping, doorways ** New Buildings, parking and landscape for Teen Challenge. | |
| TR-UTL-0925-01493 | Complete | 09/04/2025 | 11/15/2025 | Right-of-Way (ROW) - Utility | 10' x 10' BELL HOLE IN DIRT/CONCRETE TO INSTALL NEW GAS SERVICE | |
| TS-PRM-1025-00437 | Issued | 10/17/2025 | 05/17/2026 | Sign - Permanent | (1) New monument sign | |
| TC-COM-1023-02486 | Issued | 10/20/2023 | 04/20/2026 | BLDG 4 | Commercial Building | Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. |
| TF-FCP-1024-00919 | Void | 10/31/2024 | N/A | Fire Construction Permit | VOID - Will submit 4 permits for each building per Trish - Installation of Wet Pipe Sprinkler systems | |
| TF-FCP-1024-00919 | Void | 10/31/2024 | N/A | BLDG 1 | Fire Construction Permit | VOID - Will submit 4 permits for each building per Trish - Installation of Wet Pipe Sprinkler systems |
| TF-FCP-1124-00958 | Expired | 11/12/2024 | 05/25/2025 | BLDG 1 | Fire Construction Permit | Installation of New Wet Pipe sprinkler system |
| TF-FCP-1124-00959 | Expired | 11/12/2024 | 05/25/2025 | BLDG 2 | Fire Construction Permit | Installation of Wet pipe sprinkler system |
| TF-FCP-1124-00961 | Expired | 11/12/2024 | 05/25/2025 | BLDG 3 | Fire Construction Permit | Installation of new wet pipe sprinkler system |
| TF-FCP-1124-00962 | Expired | 11/12/2024 | 05/25/2025 | BLDG 4 | Fire Construction Permit | Installation of New Wet Pipe Sprinkler system |
| TF-FCP-1124-00999 | Complete | 11/21/2024 | 06/09/2025 | BLDG 1 | Fire Construction Permit | Installing PVC fire line for new building |
| TR-UTL-1225-02062 | Void | 12/03/2025 | N/A | Right-of-Way (ROW) - Utility | Kelso St: Sidewalk demo and replace, adding sidewalk scuppers, new approach, new curb, 2’ asphalt patch back. Oracle: Sidewalk demo and replace, adding sidewalk scuppers, new approach, new curb, 2’ asphalt patch back. | |
| TR-ROW-1225-01478 | Inspections | 12/08/2025 | 01/10/2026 | Right-of-Way (ROW) | **BARRICADE ONLY** FOR TR-PIA-0324-00002 Kelso St: Sidewalk demo and replace, adding sidewalk scuppers, new approach, new curb, 2’ asphalt patch back. Oracle: Sidewalk demo and replace, adding sidewalk scuppers, new approach, new curb, 2’ asphalt patch back. | |
| TR-ROW-1225-01480 | Void | 12/08/2025 | N/A | Right-of-Way (ROW) | Traffic Control for lane closures associated with approved PIA TR-PIA-0324-00002 - Teen Challenge Mens Center, U-2024-007. Kelso St: Sidewalk demo and replace, adding sidewalk scuppers, new approach, new curb, 2’ asphalt patch back. Oracle: Sidewalk demo and replace, adding sidewalk scuppers, new approach, new curb, 2’ asphalt patch back. | |
| TC-COM-1224-02321 | Inspections | 12/09/2024 | 05/25/2026 | BLDG 1 | Commercial Building | Core and Shell and Interior Fitout Plans for the Chaple Building No 1. |
| TF-FCP-1224-01063 | Complete | 12/09/2024 | 06/26/2025 | BLDG 2 | Fire Construction Permit | Installing new 6" fire line for new buildings |
| TF-FCP-1224-01064 | Complete | 12/09/2024 | 06/26/2025 | BLDG 3 | Fire Construction Permit | Installing 6" fire line and 4" remote FDC line for new building |
| TF-FCP-1224-01067 | Complete | 12/10/2024 | 06/26/2025 | BLDG 4 | Fire Construction Permit | installing 96 lf of 6" PVC fireline for new building |