Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/09/2024
Applicant:
Alicia Simmons
Description:
Core and Shell and Interior Fitout Plans for the Chaple Building No 1.

Permit Reviews

Permit Number - TC-COM-1224-02321
Permit Status: Complete
Permit Description: Core and Shell and Interior Fitout Plans for the Chaple Building No 1.
Start Date Submittal Complete Date Status  
12/11/2024 COMMERCIAL REVIEW - FULL v.1 01/09/2025 REQUIRES RESUBMIT Review Details
05/06/2026 SPECIAL INSPECTION REVIEW v.1 05/07/2026 APPROVED Review Details
02/01/2025 RESTAMP - COMMERCIAL v.1 02/03/2025 APPROVED Review Details
04/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/24/2026 APPROVED Review Details
01/15/2025 COMMERCIAL REVIEW - FULL v.2 02/01/2025 APPROVED Review Details
03/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/12/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-1224-02321
Permit Status: Complete
Permit Description: Core and Shell and Interior Fitout Plans for the Chaple Building No 1.
Date Description Comments
01/17/2025 AIR BALANCING REPORT IS REQUIRED.
05/06/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/06/2026 Post-Installed Anchor Inspection Report is required.
12/11/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/11/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/06/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/06/2026 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
01/17/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1224-02321
Permite Description: Core and Shell and Interior Fitout Plans for the Chaple Building No 1.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/25/2025 COT - HCEL - Grounding/Bonding N/A Partial Pass
11/26/2025 COT - HCEL - Electrical Underground N/A Not Ready
11/26/2025 BULD - Electrical Clearance N/A Not Ready
03/25/2026 COT - BULD - SWG Clearance N/A Not Applicable
03/09/2026 ENGR Engineering Final N/A Partial Pass OK for a level 2TCO
03/09/2026 COT - FCON - Fire - Final N/A Partial Pass TCO level 2

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1224-02321
Permit Description: Core and Shell and Interior Fitout Plans for the Chaple Building No 1.
Total Completed Inspections - 23
Date Description Inspector Results Comments
05/20/2025 COT - HCPL - Gas Pressure Test Passed
05/20/2025 COT - HCPL - Plumbing Intermediate Passed
05/23/2025 COT - HCBU - Framing Passed
05/23/2025 COT - HCEL - Electrical Intermediate Passed
05/23/2025 COT - HCEL - Electrical Above Ceiling Passed
05/23/2025 COT - HCME - Mechanical Above Ceiling Passed
05/23/2025 COT - HCME - Mechanical Intermediate Passed
04/27/2026 TRSP - ROW - Final/Close-Out Passed All work complete for the right of way and PIA
03/09/2026 COT - HCEL - Grounding/Bonding Passed
03/09/2026 COT - HCEL - Electrical Underground Passed
03/09/2026 COT - HCPL - Plumbing Roof Drains Passed
03/09/2026 COT - HCPL - Plumbing Above Ceiling Passed
03/09/2026 COT - FCON - Sprinkler - Final Passed
04/22/2026 COT - HCBU - Building Above Ceiling Passed
04/22/2026 ENGR Engineering Final Passed
04/23/2026 COT - HCEL - Outdoor Lighting Passed
04/23/2026 COT - FCON - Alarm - Final Passed
04/24/2026 COT - HCEL - Electrical Final Passed
04/24/2026 COT - HCPL - Gas Final Passed
04/24/2026 COT - HCPL - Plumbing Final Passed
04/28/2026 COT - FCON - Fire - Final Passed
04/29/2026 COT - HCBU - Building Final Passed
04/29/2026 COT - HCME - Mechanical Final Passed