Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/22/2024
Applicant:
Alicia Simmons
Description:
Structural Foundation and Superstructure Plans for the Chapel Building. Site utilities, grading, and drainage plans per Developemnt Package,

Permit Reviews

Permit Number - TC-COM-0124-00136
Permit Status: Complete
Permit Description: Structural Foundation and Superstructure Plans for the Chapel Building. Site utilities, grading, and drainage plans per Developemnt Package,
Start Date Submittal Complete Date Status  
04/01/2024 RESTAMP - COMMERCIAL v.1 04/03/2024 APPROVED Review Details
04/28/2026 SPECIAL INSPECTION REVIEW v.1 04/28/2026 REQUIRES RESUBMIT Review Details
12/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/06/2025 REQUIRES RESUBMIT Review Details
01/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 01/29/2025 REQUIRES RESUBMIT Review Details
02/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.5 02/19/2025 APPROVED Review Details
01/24/2024 COMMERCIAL REVIEW - FULL v.1 02/28/2024 REQUIRES RESUBMIT Review Details
12/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2024 REQUIRES RESUBMIT Review Details
05/05/2026 SPECIAL INSPECTION REVIEW v.2 05/06/2026 APPROVED Review Details
03/15/2024 COMMERCIAL REVIEW - FULL v.2 04/01/2024 APPROVED Review Details
02/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.4 02/10/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0124-00136
Permit Status: Complete
Permit Description: Structural Foundation and Superstructure Plans for the Chapel Building. Site utilities, grading, and drainage plans per Developemnt Package,
Date Description Comments
01/24/2024 Please provide plans which contain the Building Number 1 associated with this permit.
03/29/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/29/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/29/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/29/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/29/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
03/29/2024 Masonry Inspection Report submittal review is required.
03/29/2024 Post-Installed Anchor Inspection Report is required.
01/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/29/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00136
Permite Description: Structural Foundation and Superstructure Plans for the Chapel Building. Site utilities, grading, and drainage plans per Developemnt Package,
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
08/19/2024 COT - HCBU - Masonry Pregrout N/A Partial Pass Chapel stage walls, ok for grout, south staff living area retaining wall, ok for grout
12/30/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Footer inspection approved for canopy 1 support. Total of 4. 2 footers for foundation plan for canopy 13 per detail 501 & 504. Page S2.0 details on S3.0. Total of 6. Reinforcements per plan. Okay for concrete placement. 12/30/2025
03/09/2026 COT - HCBU - Interior Shear Bracing N/A Not Applicable
03/09/2026 BULD - Electrical Clearance N/A Not Applicable
07/11/2024 COT - HCEL - Grounding/Bonding N/A Partial Pass
09/09/2024 COT - HCEL - Electrical Underground N/A Partial Pass 9/9/24: electrical underground at chapel per plans ok to proceed.
04/01/2025 COT - HCBU - Framing N/A Partial Pass West radius wall and interior shear walls. Approved.
Doors 001,002 pending shear walls. Hold downs approved at door openings. okay to cover. 4/1/2025
12/30/2025 COT - HCBU - Preslab N/A Partial Pass Footer inspection approved for canopy 1 support. Total of 4. 2 footers for foundation plan for canopy 13 per detail 501 & 504. Page S2.0 details on S3.0. Total of 6. Reinforcements per plan. Okay for concrete placement. 12/30/2025
03/09/2026 COT - BULD - SWG Clearance N/A Not Applicable
03/09/2026 COT - HCBU - Building Final N/A Not Applicable
11/13/2025 COT - HCBU - Building Above Ceiling N/A Partial Pass Foyer room #101 approved. Okay to drop in ceiling tiles. 11/13/2025
03/09/2026 ENGR Engineering Final N/A Partial Pass OK for a level 2TCO
03/09/2026 COT - FCON - Alarm - Final N/A Partial Pass
03/09/2026 COT - FCON - Fire - Final N/A Partial Pass Approved for level 2 TCO.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00136
Permit Description: Structural Foundation and Superstructure Plans for the Chapel Building. Site utilities, grading, and drainage plans per Developemnt Package,
Total Completed Inspections - 17
Date Description Inspector Results Comments
08/14/2024 COT - HCPL - Rough Soil Passed
04/01/2025 COT - HCBU - Roof Nailing Passed Both high and low roofs approved. Okay for roofing systems. 4/1/2025
09/25/2025 COT - HCPL - Yard Water Line Passed
03/02/2026 COT - HCBU - Masonry Pregrout Passed
04/27/2026 TRSP - ROW - Final/Close-Out Passed All work complete for the right away and PIA
03/09/2026 COT - HCBU - Excavation/Rebar/Zoning Passed
03/09/2026 COT - HCEL - Grounding/Bonding Passed
03/09/2026 COT - HCPL - Sewer Passed
03/09/2026 COT - HCEL - Electrical Underground Passed
03/09/2026 COT - HCBU - Framing Passed
03/09/2026 COT - HCBU - Preslab Passed
03/09/2026 COT - FCON - Sprinkler - Final Passed
03/09/2026 COT - HCBU - Stem Wall/Retaining Wall Passed
03/17/2026 COT - HCBU - Building Above Ceiling Passed
04/22/2026 ENGR Engineering Final Passed
04/29/2026 COT - FCON - Alarm - Final Passed
04/29/2026 COT - FCON - Fire - Final Passed