Permit: TC-COM-0824-01675
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2637 N ORACLE RD BLDG 3
Address NEW:
2637 N ORACLE RD BLDG 3
Apply Date:
08/27/2024
Applicant:
Alicia Simmons
Description:
Core and Shell and Interior Fitout Plans for the Administration Building No 3.
Permit Reviews
Permit Number - TC-COM-0824-01675
Permit Status: Complete
Permit Description: Core and Shell and Interior Fitout Plans for the Administration Building No 3.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2025 | APPROVED |
| 10/14/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/22/2024 | APPROVED |
| 03/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/12/2026 | APPROVED |
| 08/29/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/30/2024 | REQUIRES RESUBMIT |
| 10/22/2024 | RESTAMP - COMMERCIAL v.1 | 10/30/2024 | APPROVED |
| 04/28/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/30/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0824-01675
Permit Status: Complete
Permit Description: Core and Shell and Interior Fitout Plans for the Administration Building No 3.
| Date | Description | Comments |
|---|---|---|
| 10/21/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/29/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 10/21/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01675
Permite Description: Core and Shell and Interior Fitout Plans for the Administration Building No 3.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Partial pass. Hard lid areas only. Okay to proceed progress areas. 4/17/2025 |
| 09/15/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | |
| 03/09/2026 | COT - HCPL - Gas Pressure Test | N/A | Not Applicable | |
| 03/09/2026 | ENGR Engineering Final | N/A | Partial Pass | OK for a level 2TCO |
| 03/09/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | approved for TCO level 2 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01675
Permit Description: Core and Shell and Interior Fitout Plans for the Administration Building No 3.
Total Completed Inspections - 22