Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/17/2025
Applicant:
Alicia Simmons
Description:
Core and Shell and Interior Fitout Plans for the Staff Living Building No 2.

Permit Reviews

Permit Number - TC-COM-0225-00339
Permit Status: Complete
Permit Description: Core and Shell and Interior Fitout Plans for the Staff Living Building No 2.
Start Date Submittal Complete Date Status  
05/14/2026 SPECIAL INSPECTION REVIEW v.1 05/14/2026 APPROVED Review Details
04/28/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/30/2026 APPROVED Review Details
04/02/2025 COMMERCIAL REVIEW - FULL v.2 04/04/2025 REQUIRES RESUBMIT Review Details
04/15/2025 COMMERCIAL REVIEW - FULL v.3 04/21/2025 APPROVED Review Details
04/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/24/2026 APPROVED Review Details
04/21/2025 RESTAMP - COMMERCIAL v.1 04/23/2025 APPROVED Review Details
02/21/2025 COMMERCIAL REVIEW - FULL v.1 03/20/2025 REQUIRES RESUBMIT Review Details
05/06/2026 SPECIAL INSPECTION REVIEW v.1 05/08/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0225-00339
Permit Status: Complete
Permit Description: Core and Shell and Interior Fitout Plans for the Staff Living Building No 2.
Date Description Comments
04/21/2025 AIR BALANCING REPORT IS REQUIRED.
05/07/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/07/2026 Post-Installed Anchor Inspection Report is required.
02/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/07/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/21/2025 SPECIAL INSPECTION FOR WATER-RESISTIVE BARRIER COATING IS REQUIRED
02/21/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/07/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/07/2026 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
04/21/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00339
Permite Description: Core and Shell and Interior Fitout Plans for the Staff Living Building No 2.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/30/2025 COT - HCPL - Plumbing Above Ceiling N/A Not Ready
03/17/2026 COT - HCPL - Gas Pressure Test N/A Not Applicable
12/04/2025 COT - HCEL - Grounding/Bonding N/A Partial Pass Pole lights at Student services (3), courtyard canopy area (2), Southwest portion of site (2); electric conduits and electric ufers in place. Courtyard canopy column footings (9), Ok to place concrete in progress areas.
12/17/2025 COT - HCEL - Electrical Underground N/A Not Ready
03/17/2026 BULD - Electrical Clearance N/A Not Applicable
11/18/2025 COT - HCME - Mechanical Above Ceiling N/A Partial Pass
10/30/2025 COT - HCME - Venting N/A Not Ready some overhead fans are not wired in
11/18/2025 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass
04/27/2026 COT - HCBU - Building Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00339
Permit Description: Core and Shell and Interior Fitout Plans for the Staff Living Building No 2.
Total Completed Inspections - 26
Date Description Inspector Results Comments
08/27/2025 COT - HCEL - Electrical Intermediate Passed
10/30/2025 COT - HCBU - Exterior Clips/Sheathing Passed
10/30/2025 COT - HCPL - Plumbing Intermediate Passed
11/10/2025 COT - HCBU - Framing Passed
12/11/2025 COT - HCME - Mechanical Intermediate Passed
02/18/2026 COT - HCPL - Plumbing Above Ceiling Passed
02/18/2026 COT - HCEL - Electrical Above Ceiling Passed
02/18/2026 COT - BULD - SWG Clearance Passed
03/17/2026 COT - HCEL - Grounding/Bonding Passed
03/17/2026 COT - HCEL - Electrical Underground Passed
03/19/2026 COT - HCPL - Yard Water Line Passed
03/19/2026 COT - HCME - Mechanical Above Ceiling Passed
03/19/2026 COT - HCPL - Gas Final Passed
03/19/2026 COT - HCBU - Roof Nailing Passed
03/19/2026 COT - HCME - Venting Passed
03/19/2026 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
03/19/2026 COT - HCBU - Building Above Ceiling Passed
04/23/2026 COT - FCON - Sprinkler - Final Passed
04/23/2026 COT - FCON - Alarm - Final Passed
04/24/2026 COT - HCPL - Plumbing Final Passed
04/24/2026 COT - HCEL - Electrical Final Passed
04/27/2026 TRSP - ROW - Final/Close-Out Passed All work complete for the right of way and PIA
04/28/2026 ENGR Engineering Final Passed
04/28/2026 COT - FCON - Fire - Final Passed
04/29/2026 COT - HCEL - Outdoor Lighting Passed
04/29/2026 COT - HCME - Mechanical Final Passed

Documents

File Name Document Type  
TC-COM-0225-00339_TEEN CHALLENGE SPECIAL INSPECTIONS EIFS - SIGNED-2026-05-13_V1.PDF DOCUMENTS VIEW
TC-COM-0124-00137_TEEN CHALLENGE_63241086 - SIGNED-2026-05-01_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
TEEN CHALLENGE MENS CENTER STAFF LIVING - TAB REPORT_V1.PDF DOCUMENTS VIEW
TC STAFF LIVING CHLORINATION REPORT-2026-04-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TCMC BLDG2_STAFF LIVING AMPE PH3-4_S02_R01_V3.PDF DOCUMENTS VIEW
SPECINSPECTCERT B2_SL_S03-2025-04-15_V2.PDF DOCUMENTS VIEW
SPECINSPECTCERT BLDG2_SL_R1_S02-2025-04-15_V2.PDF DOCUMENTS VIEW
TCMC BLDG2_SL COMCHECK_S02_V2.PDF DOCUMENTS VIEW
TCMC BLDG2_SL HVAC LOAD CALC_S02_V3.PDF DOCUMENTS VIEW
TCMC BLDG2_SL LTR ELECT CALCS_S02_V2.PDF DOCUMENTS VIEW
TCMC BLDG2_SL LTR ELECT OUTDOOR LIGHTING_S02_V3.PDF DOCUMENTS VIEW
TCMC FINAL CD SPEC_REV_02-17-2025_S02_V2.PDF DOCUMENTS VIEW