Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S06-031
Plan Details
Apply Date:
02/07/2006
Applicant:
STANTEC
Description:
SUBC
Contractors:
- STANTEC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2008 | ASSURANCE - DOT TRAFFIC | TSTOCKET | Approved | PLAN NO. : I-2006-093 This project was inspected and is acceptable to Traffic Engineering as of Sept. 11, 2008. Lots 1448 to 1530. |
10/23/2008 | ASSURANCE - DOT PERMITS & CODE | RLEIGH | Approved | PLAN NO. : I-2006-093 The work outlined in the subject Private Improvement Agreement contract has been completed . On October 23, 2008, the City of Tucson has accepted the right-of-way improvements associated with Sierra Morado Unit 4, Phase 1 subdivision for operation and maintenance. All remaining sidewalks to be constructed shall be construction under separate right-of-way permits. Maintenance of sidewalk areas is the responsibility of the abutting property owner. |
03/02/2009 | ASSURANCE - UTILITY SERVICES | LHERNAND | Approved | SEE SIRE |
10/06/2010 | ASSURANCE - DSD | DROBERTS | Approved | THE SITE WAS CHECKED TO VERIFY WHAT WORK HAD BEEN STARTED AT THIS TIME AND WHERE THEY MAYBE IN REGARDS TO ASKING FOR LOT RELEASES. A PARTIAL RELEASE OF THIS SITE HAD BEEN DONE IN THE PAST. LOT RELEASES WILL ONLY BE CONSIDERED IN THE AREAS WHERE WE HAVE RECEIVED AND ACCEPTANCE OF DISCHARGE LETTER FROM PIMA COUNTY WASTEWATER. THIS AREA IS LIMITED ONLY TOO LOTS 1448 TO 1530, ALL OTHER LOTS ARE NOT RELEASEABLE AT THIS TIME AND WILL REQUIRE AN ADDITIONAL RELEASE LETTER. THE CONTRACTOR HAS COMPLETED 90% OF THE ROADS IN PHASE 2 PORTION OF THIS SITE AND HAVE ROUGHLY CUT THE BASINS. THESE LOTS CAN NOT BE RELEASED UNTIL WE HAVE RECEIVED A RELEASE LETTER FROM PCWW. CURRENTLY EITHER ALL OR PORTIONS OF WHITE SAGE DRIVE, MORNING SHADOWS DRIVE,SUNRISE PARK ROAD, PALMETTO POINTE TRAIL, PASSION FLOWER LANE, AND PRAIRIE WIND TRAIL HAVE NOT BEEN CONSTRUCTED. ANY RELEASES OF THIS SITE WILL REQUIRE AN INSPECTION TO VERIFY THAT ALL REQUIRED WORK IS COMPLETE, AND THAT A ACCEPTANCE OF DISCHARGE LETTER HAS BEEN GIVEN FOR PHASE 2 OF THIS SITE. |
11/17/2010 | ASSURANCE - PC WASTEWATER | RMONTOYA | Approved | LOTS 1118-1153 1311-1328 G-2009-036 SEE SIRE |
Plan Reviews
Plan Number - S06-031
Plan Status: Final
Plan Description: SUBC
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2006 | TENTATIVE PLAT REVIEW | 04/18/2006 | COMPLETED |
04/19/2006 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 06/12/2006 | COMPLETED |
04/23/2007 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 05/31/2007 | COMPLETED |
04/23/2007 | ASSURANCES | 06/18/2007 | COMPLETED |
05/08/2006 | FINAL PLAT REVIEW | 06/16/2006 | COMPLETED |
06/05/2007 | FINAL PLAT PACKAGE | 06/29/2007 | COMPLETED |
06/16/2009 | REVISN TENT PLAT & CORE RESUB | 07/23/2009 | COMPLETED |
07/24/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 10/06/2006 | COMPLETED |
07/24/2006 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 09/19/2006 | COMPLETED |
07/24/2006 | ASSURANCES | 08/04/2006 | COMPLETED |
09/28/2007 | CORE REVIEW | 10/31/2007 | COMPLETED |
10/04/2006 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 11/14/2006 | COMPLETED |
10/09/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 11/14/2006 | COMPLETED |
10/09/2006 | ASSURANCES | 11/07/2006 | COMPLETED |
11/05/2007 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 12/10/2007 | COMPLETED |
12/06/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 01/05/2007 | COMPLETED |
Completed Activity Conditions
Plan Number - S06-031
Plan Description: SUBC
Date | Name | Approved | Comments |
---|---|---|---|
CD |