Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 10901 E DREXEL RD
Search
Permits
Address: 10901 E DREXEL RD
Date - 12/22/2024 10:26 p.m.
Total Number Of Permits - (21)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DS06-40 | Approved | 09/15/2006 | N/A | Zoning Compliance | SIERRA MORADO UNIT 4 - DSMR06-40 SIERRA MORADO UNIT 4-LOTS 1118-1530 | |
T06AN00450 | ISSUED | 04/20/2006 | N/A | ADDRNEW | ||
T06BU00959 | EXPIRED | 04/20/2006 | 05/23/2015 | GRADING | Sierra Morado Unit 4 West | |
T06BU01156 | WITHDRWN | 05/15/2006 | N/A | GRADING | Sierra Morado Unit 3, phase 1 | |
T06BU01361 | WITHDRWN | 05/31/2006 | N/A | GRADING | Sierra Morado Unit 3, phase 2 | |
T06BU01916 | FINAL | 08/02/2006 | 10/19/2020 | GRADING | GRADING CUT 86000 FILL 17000 | |
T07CM01075 | WITHDRWN | 03/16/2007 | N/A | COMBO | PRIVATE SEWER FOR SIERRA MORADO UNIT 4 PHASE 2 | |
T07OT00686 | ISSUED | 03/26/2007 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T07OT00687 | WITHDRWN | 03/26/2007 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T07OT00688 | WITHDRWN | 03/26/2007 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T07OT00689 | FINAL | 03/26/2007 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T08BU00795 | FINAL | 04/23/2008 | 04/15/2018 | GRADING | CUT 21,500 CY FILL 55,100 CY | |
T10PL00160 | FINAL | 01/29/2010 | 06/14/2011 | PLUMB | SITE SEWER | |
T10PL00363 | WITHDRWN | 03/05/2010 | N/A | PLUMB | PRIVATE SEWER | |
T12PL00200 | FINAL | 02/03/2012 | 11/04/2012 | PLUMB | PRIVATE SEWER PHASE 2 AND 3 ONLY | |
T13CM02031 | EXPIRED | 04/08/2013 | 02/10/2014 | COMBO | PRIVATE SEWER PHASE 4 & 5 & 6 ONLY | |
T13EX01065 | CLOSED | 10/03/2013 | 04/01/2014 | EXCAV | For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-031 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID. | |
T13EX01108 | CLOSED | 10/18/2013 | N/A | EXCAV | For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-031 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID. | |
T13EX01109 | CLOSED | 10/18/2013 | N/A | EXCAV | For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-032 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID. | |
T13EX01173 | CLOSED | 10/29/2013 | N/A | EXCAV | For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-033 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID. | |
T13EX01174 | CLOSED | 10/29/2013 | N/A | EXCAV | For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-033 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID. |
Plans
Address: 10901 E DREXEL RD
Date - 12/22/2024 10:26 p.m.
Total Number Of Plans - (15)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
S06-031 | FINAL | 02/07/2006 | 09/01/2019 | SUBDIVISION -- SUBD | SIERRA MORADO UNIT 4 | |
S12-019 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-020 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-021 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-022 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-023 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-024 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-025 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-026 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-027 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-028 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-029 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-030 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
S12-031 | FINAL | 04/03/2012 | N/A | LOT SPLIT -- LSPT | SIERRA MORADO LOT SPLIT | |
T09PI00018 | FINAL | 10/16/2009 | 12/08/2010 | PAVING -- 205 | SIERRA MORADO |