Address: 10901 E DREXEL RD
Date - 11/14/2024 4:29 a.m.
Total Number Of Permits - (21)
Permit Status Apply Date Expired Date Unit Type Description
DS06-40 Approved 09/15/2006 N/A Zoning Compliance SIERRA MORADO UNIT 4 - DSMR06-40 SIERRA MORADO UNIT 4-LOTS 1118-1530
T06AN00450 ISSUED 04/20/2006 N/A ADDRNEW
T06BU00959 EXPIRED 04/20/2006 05/23/2015 GRADING Sierra Morado Unit 4 West
T06BU01156 WITHDRWN 05/15/2006 N/A GRADING Sierra Morado Unit 3, phase 1
T06BU01361 WITHDRWN 05/31/2006 N/A GRADING Sierra Morado Unit 3, phase 2
T06BU01916 FINAL 08/02/2006 10/19/2020 GRADING GRADING CUT 86000 FILL 17000
T07CM01075 WITHDRWN 03/16/2007 N/A COMBO PRIVATE SEWER FOR SIERRA MORADO UNIT 4 PHASE 2
T07OT00686 ISSUED 03/26/2007 N/A FLOODPLN FLOODPLAIN USE PERMIT
T07OT00687 WITHDRWN 03/26/2007 N/A FLOODPLN FLOODPLAIN USE PERMIT
T07OT00688 WITHDRWN 03/26/2007 N/A FLOODPLN FLOODPLAIN USE PERMIT
T07OT00689 FINAL 03/26/2007 N/A FLOODPLN FLOODPLAIN USE PERMIT
T08BU00795 FINAL 04/23/2008 04/15/2018 GRADING CUT 21,500 CY FILL 55,100 CY
T10PL00160 FINAL 01/29/2010 06/14/2011 PLUMB SITE SEWER
T10PL00363 WITHDRWN 03/05/2010 N/A PLUMB PRIVATE SEWER
T12PL00200 FINAL 02/03/2012 11/04/2012 PLUMB PRIVATE SEWER PHASE 2 AND 3 ONLY
T13CM02031 EXPIRED 04/08/2013 02/10/2014 COMBO PRIVATE SEWER PHASE 4 & 5 & 6 ONLY
T13EX01065 CLOSED 10/03/2013 04/01/2014 EXCAV For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-031 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID.
T13EX01108 CLOSED 10/18/2013 N/A EXCAV For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-031 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID.
T13EX01109 CLOSED 10/18/2013 N/A EXCAV For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-032 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID.
T13EX01173 CLOSED 10/29/2013 N/A EXCAV For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-033 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID.
T13EX01174 CLOSED 10/29/2013 N/A EXCAV For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-033 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID.

Plans

Address: 10901 E DREXEL RD
Date - 11/14/2024 4:29 a.m.
Total Number Of Plans - (15)
Plan Number Status Application Date Exp Date Unit Type Description
S06-031 FINAL 02/07/2006 09/01/2019 SUBDIVISION -- SUBD SIERRA MORADO UNIT 4
S12-019 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-020 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-021 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-022 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-023 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-024 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-025 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-026 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-027 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-028 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-029 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-030 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
S12-031 FINAL 04/03/2012 N/A LOT SPLIT -- LSPT SIERRA MORADO LOT SPLIT
T09PI00018 FINAL 10/16/2009 12/08/2010 PAVING -- 205 SIERRA MORADO