Permit: TD-DEV-1224-00334
Permit Details
Apply Date:
12/10/2024
Applicant:
Brittini Halula
Description:
RESTRICTED RECORD - 120 unit, 4-story, multi-family affordable housing project
Permit Reviews
Permit Number - TD-DEV-1224-00334
Permit Status: Inspections
Permit Description: RESTRICTED RECORD - 120 unit, 4-story, multi-family affordable housing project
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/11/2024 | DEVELOPMENT PACKAGE NEW v.1 | 12/19/2024 | REQUIRES RESUBMIT |
| 03/06/2025 | DEVELOPMENT PACKAGE NEW v.3 | 03/26/2025 | REQUIRES RESUBMIT |
| 06/04/2025 | DEVELOPMENT PACKAGE NEW v.5 | 06/11/2025 | APPROVED |
| 04/21/2025 | DEVELOPMENT PACKAGE NEW v.4 | 05/28/2025 | REQUIRES RESUBMIT |
| 12/19/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/24/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-1224-00334
Permit Status: Inspections
Permit Description: RESTRICTED RECORD - 120 unit, 4-story, multi-family affordable housing project
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/23/2025 | Prior to project being finalized applicant must provide copy of avigation easement requested by Tucson Airport Authority. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-1224-00334
Permite Description: RESTRICTED RECORD - 120 unit, 4-story, multi-family affordable housing project
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2025 | N/A | Partial Pass | Grading progress on basins and PAAL is underway. | |
| 03/12/2026 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | no concerns at this time everything looks good |
| 04/08/2026 | N/A | Partial Pass | contractor installed 90 lineal feet of 30 inch HDPE north end of the project good to backfield | |
| 04/28/2026 | ENGR - Drainage Structures | N/A | Partial Pass | 24" HDPE. Last section of Pipe from STA 5 + 15.98. Upgrade to end of pipe at STA 9+83.79. Pipe is set with survey offsets and elevations nails in place. Slope along length is reasonably +/- .5% Joints look tight and correct. Sealant visible inside Basin joints to pipe. Trenching/Bedding is good okay to backfill. Submit density results to the portal. Note: Port a John’s will be staked for next inspection. |
| 06/29/2026 | For trash and recycling enclosures | N/A | Partial Pass | Add verts to ends of wall so there are 2 reinforced cells at both ends and 3 in the corners. Bond beam is correct, horizontal reinforceing good. Okay to grout up to bond beam of 4 Enclosures at grade. Contractor will wet set verts to continue up to top of wall for second lift. Current verts will not reach top. Reschedule this pregrout inspection for second lift. When ready to pour floor and bollards schedule this inspection so we can check reinforcing and slope of floor and bollards spacing. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-1224-00334
Permit Description: RESTRICTED RECORD - 120 unit, 4-story, multi-family affordable housing project
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 12/02/2025 | NPPO Pre-Construction | Passed | NPPO plan is good. | |
| 12/02/2025 | SITE - Stormwater Setup and Controls | Passed | Perimeter controls, track-out rock, and site posting are pending delivery. These will be in place prior to excavation. |