Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | ENGR - Drainage Structures | Partial Pass | 24" HDPE. Last section of Pipe from STA 5 + 15.98. Upgrade to end of pipe at STA 9+83.79. Pipe is set with survey offsets and elevations nails in place. Slope along length is reasonably +/- .5% Joints look tight and correct. Sealant visible inside Basin joints to pipe. Trenching/Bedding is good okay to backfill. Submit density results to the portal. Note: Port a John’s will be staked for next inspection. |