Permit: TD-DEV-1122-00057
Permit Details
Apply Date:
11/30/2022
Applicant:
Lawson Fanney
Description:
New Home Depot building and associated improvements.
Permit Reviews
Permit Number - TD-DEV-1122-00057
Permit Status: Complete
Permit Description: New Home Depot building and associated improvements.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/08/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/28/2023 | REQUIRES RESUBMIT |
09/13/2023 | DEVELOPMENT PACKAGE NEW v.3 | 09/28/2023 | APPROVED |
11/24/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 12/19/2023 | APPROVED |
08/18/2023 | DEVELOPMENT PACKAGE NEW v.2 | 09/05/2023 | REQUIRES RESUBMIT |
02/06/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 05/23/2023 | REQUIRES RESUBMIT |
10/19/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/22/2023 | REQUIRES RESUBMIT |
12/14/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/23/2022 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1122-00057
Permite Description: New Home Depot building and associated improvements.
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/09/2023 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | Everything still in place and looks good at this time. Contractor will call in every two weeks for stormwater inspection. |
01/08/2024 | SITE | N/A | Complete (Recurring) | contractor installed 160+ or minus lineal feet of 24 inch HDPE on the south side of the building. |
02/07/2024 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Contractor installed 180 lineal feet of HDPE pipe on the east end of the building. Also pouring for the manhole on the south east corner of the building. |
03/12/2024 | ENGR - Drainage Structures | N/A | Partial Pass | Contractor can pour the footer for the screen wall 500 lineal feet |
12/15/2023 | SITE - SWPPP Correction Notice | N/A | Complete (Recurring) | No concerns at this time. Spoke to Ethan fencing which has blown over will be corrected next week and wattle restated. |
06/24/2024 | ENGR Grading Final | N/A | Partial Pass | Contractor paved in front of the building about half of it Friday |
03/15/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | All setup and controls are in place and no concerns to note at this time. |
08/23/2024 | Consultation SITE | N/A | Partial Pass | We are good for a TCO4 pending the rails and asphalt in an accessible walkway east of the nursery center. This needs to be completed by the 28th of August. |
08/20/2024 | ENGR Engineering Final | N/A | Not Ready | 1) Separation between curb and PAAL, bollards are needed across the front at the door entry's to the store and at the loading area between columns. Bollards are to be no more then 5' between each bollard and set per the TSM. 2) All water harvesting areas need to be redone to have a 6" min depth from top of cut/asphalt. 3) All nursery stakes need to be pulled. 4) Van Accessible signs need to be added to all 10 ADA parking locations. 5) Need to research long term bike parking. 6) ADA rails needed at west end accessible path to store from sidewalk. 7) At same west location asphalt will have to be raised to meet the 5% rule going from the outdoor garden area to the concrete walk. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1122-00057
Permit Description: New Home Depot building and associated improvements.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/20/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
10/10/2024 | COT - FCON - Fire - Final | Passed | ||
10/14/2024 | ENGR Engineering Final | Passed | ||
10/16/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed |