Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2024 |
Consultation SITE |
|
Passed |
Consultation was for pedestrian access and pals. It has been decided that with no 6" vertical curb to separate the bollards would be needed for protection. For a TCO4 a temporary fix of cinder block pallets would be used in lieu of. Friday will be the TCO4 inspection. |
| 08/23/2024 |
Consultation SITE |
|
Partial Pass |
We are good for a TCO4 pending the rails and asphalt in an accessible walkway east of the nursery center. This needs to be completed by the 28th of August. |