Inspection Status: Complete (Recurring)
Inspection History: SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/08/2024 |
SITE |
|
Complete (Recurring) |
contractor installed 160+ or minus lineal feet of 24 inch HDPE on the south side of the building. |
| 12/19/2023 |
SITE |
|
Not Ready |
Contractor has not started on the water harvesting yet. |
| 12/21/2023 |
SITE |
|
Complete (Recurring) |
Contractor called in the wrong inspection. He needed to call in storm drain installation. Installed 180 lineal feet to 24 inch HDPE pipe two laterals and one mainline. |