Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE
Permit Number - TD-DEV-1122-00057
Inspection Description - SITE
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2024 | SITE | Complete (Recurring) | contractor installed 160+ or minus lineal feet of 24 inch HDPE on the south side of the building. | |
12/19/2023 | SITE | Not Ready | Contractor has not started on the water harvesting yet. | |
12/21/2023 | SITE | Complete (Recurring) | Contractor called in the wrong inspection. He needed to call in storm drain installation. Installed 180 lineal feet to 24 inch HDPE pipe two laterals and one mainline. |