Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 14118008L


Addresses:

10100 E OLD VAIL RD


Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - TD-DEV-1122-00057

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
01/17/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
02/06/2024 SITE - Stormwater Follow-up Partial Pass Contractor installed 36 inch HPDE pipe on the south side of the building 180 lineal feet. Good to backfill it.
02/07/2024 SITE - Stormwater Follow-up Complete (Recurring) Contractor installed 180 lineal feet of HDPE pipe on the east end of the building. Also pouring for the manhole on the south east corner of the building.
02/09/2024 SITE - Stormwater Follow-up Not Ready Terracon did not pass density test and inspection will be recalled on Monday the 12th.
02/12/2024 SITE - Stormwater Follow-up Not Ready contractor called in for inspection for the floor and the walls for the catch basin on the north east side of the building about 150 feet away from the building. Not ready did not pass density inspection needs to remove the rebar and get compaction and pass the density inspection before pouring.
02/13/2024 SITE - Stormwater Follow-up Partial Pass Contractor is going to pour the floors for three catch basins one on the north east quadrant of the building one on the north of the building and the third one is north west of the building all of them about 300 feet away from the building
02/14/2024 SITE - Stormwater Follow-up Partial Pass contractor seven steel for catch basin five and six good to pour
03/15/2024 SITE - Stormwater Follow-up Complete (Recurring) All setup and controls are in place and no concerns to note at this time.
03/26/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns with the stormwater follow up at this time. To add to this inspection they’re going to pour the tops for to catch basins on the south end of the building. They’re good to pour for tomorrow.
03/27/2024 SITE - Stormwater Follow-up Partial Pass Contractor is connecting the roof drain to the storm drain on the south west side of the building
06/17/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
07/09/2024 SITE - Stormwater Follow-up Complete (Recurring) no concerns at this time. Wattles are all still in place.
12/18/2023 SITE - Stormwater Follow-up Complete (Recurring) Call tracker installed 36 inch HDPE Station 10+00 10 Station 12+00300 feet going east and another AT STATION 17+28 GOING NORTH300 feet going east and 262 GOING NORTH