Permit Reviews

Permit Number - TD-DEV-1122-00029
Permit Status: Inspections
Permit Description: New Drive-thru restaurant building
Start Date Submittal Complete Date Status  
04/10/2023 DEVELOPMENT PACKAGE REVIEW v.2 08/26/2024 REQUIRES RESUBMIT Review Details
11/07/2022 DEVELOPMENT PACKAGE REVIEW v.1 12/28/2022 REQUIRES RESUBMIT Review Details
04/30/2025 DEVELOPMENT PACKAGE REVIEW v.3 05/20/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-1122-00029
Permit Status: Inspections
Permit Description: New Drive-thru restaurant building
Total Outstanding Activity Conditions - 1
Date Name
06/06/2025 Prior to final issuance - associated COM permit

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1122-00029
Permite Description: New Drive-thru restaurant building
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
02/03/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar N/A Partial Pass Call Directors good to pour the menu boards foundation
01/07/2026 Grading Progress ENGR N/A Not Ready contractor needs regrade the drive-through area before placing AB.
02/10/2026 Consultation SITE N/A Partial Pass 2/10/26
Footer for crash bar in drive through. Dimensions and reinforcement correct to stamped detail and location is correct to DP. Hole for footer is large/oversized due to previous footer being removed. Backfill in lifts and compact. Get a compaction report on the backfill.
Contractor is at Risk. Permit for footer is not approved or issued.
02/18/2026 N/A Not Ready Rebar cage for flagpole has been displaced and is making ground contact in multiple places. Re-call inspection once corrected.
09/09/2025 For trash and recycling enclosures N/A Partial Pass 9/9/25
Bollards are now placed correctly. Mat for slab-dobies are being flipped for correct 3" spacing to the Subgrade. Slope on mat is correct. Okay to pour slab.

Call is back out for Flatwork inspections(sidewalk, curb ramps and curbs).
02/23/2026 COT - ENGR - Signage Final N/A Not Ready Handicap van accessible sign parking sign needs 7’ clear to finish grade. Detail A page 9.
ENGR Paving N/A Scheduled
N/A Scheduled
ENGR Engineering Final N/A Scheduled

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1122-00029
Permit Description: New Drive-thru restaurant building
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/12/2025 PDSD Engineering Division Pre-Construction SITE Passed Went over the specs needed for this site, handed out a proper trash enclosure detail and inspection sheet. NPPO and SWPPP no needed here.
02/09/2026 Grading Progress ENGR Passed
02/23/2026 For trash and recycling enclosures Passed
02/23/2026 ENGR Grading Final Passed 2/23/26
Handicap area parking space and aisle are fixed and the rest of grade looks good. Drive through will and in front of refuse enclosure be 3" over 4". Parking spaces 2.5" over 4"
Density testing is good. Reveals good. Okay to pave.
02/23/2026 Passed
02/24/2026 LAND Landscape Appearance & Function Final Passed Have As-Builts note new locations for Water Meters/Backflow preventer and pressure reducers and any other changes for final closeout. RFI Civil about the Grouted RipRap outlet swale shown at Water Harvesting Basin 1. This will be checked at the DP Final.

Scheduled Inspections

Scheduled Inspections - TD-DEV-1122-00029
Status: Inspections
Description: New Drive-thru restaurant building
Scheduled Date Description Entered By Entered Date
02/25/2026 ENGR Paving Scheduled
02/25/2026 ENGR Engineering Final Scheduled
02/25/2026 Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
(CORRECT)2_PLAN SET - BRIDGES B-III LOT 6- DP - 2023-04-04_V1.PDF DOCUMENTS VIEW
1_C9-06-32_REZONING_PAD_V1.PDF DOCUMENTS VIEW
1_C9-06-32_REZONING_PAD_V1_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT-2022-10-31_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT-2022-10-31_V1_V1.PDF DOCUMENTS VIEW
1_PLAN SET_2022-11-07_V1.PDF DOCUMENTS VIEW
1_SWPPP - 2022-10-31_V1.PDF DOCUMENTS VIEW
2_DRAINAGE STATEMENT - BRIDGES B-III LOT 6 - 2023-04-07_V2.PDF DOCUMENTS VIEW
2_DRC APPROVAL.COFFEE BEAN - TEA LEAF_V1.PDF DOCUMENTS VIEW
2_PLAN SET - BRIDGES B-III LOT 6- DP - 2023-04-04_V2.PDF DOCUMENTS VIEW
3_DRAINAGE STATEMENT - BRIDGES B-III LOT6 - HYDRO - 2025-02-10_V1.PDF DOCUMENTS VIEW
3_PLAN SET - BRIDGES B-III LOT 6 - BLACK RIFLE COFFEE - DP_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
(CORRECT)2_PLAN SET - BRIDGES B-III LOT 6- DP - 2023-04-04_V1.PDF DOCUMENTS VIEW
1_C9-06-32_REZONING_PAD_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT-2022-10-31_V1.PDF DOCUMENTS VIEW
1_PLAN SET_2022-11-07_V1.PDF DOCUMENTS VIEW
1_SWPPP - 2022-10-31_V1.PDF DOCUMENTS VIEW