Permit: TD-DEV-1122-00029

Parcel: 13213123A


Addresses:

3450 S KINO PW

Inspection Status: Partial Pass

Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar

Date Description Inspector Results Comments
02/03/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass Call Directors good to pour the menu boards foundation
02/06/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Not Applicable The menu boards and drive through signage footers are on a separate permit. So I cannot inspect them on this permit. I was told by contractor Martin looked at the footers and said they were built to plan as well as 3rd party inspector, and pictures were taken before the pour.
10/30/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Not Ready Contractors not ready for inspections for the pole foundations no rebar cages no ground wires no conduit. Call for inspection tomorrow.
10/31/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass Okay to pour light pole foundations.