Description:
Revision 3 Rev 2 - AVP Development Package for an FLD subdivision consisting of 129 residential lots & Common Areas "A" (Private Streets), "B-1" thru "B-4" (Functional Open Space, Drainage, Utilities, Landscape) & "C-1" thru "C-4" (Open Space, Utilities)
Permit Reviews
Permit Number - TD-DEV-1024-00280
Permit Status: In review
Permit Description: Revision 3
Rev 2 - AVP
Development Package for an FLD subdivision consisting of 129 residential lots & Common Areas "A" (Private Streets), "B-1" thru "B-4" (Functional Open Space, Drainage, Utilities, Landscape) & "C-1" thru "C-4" (Open Space, Utilities)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | N/A | IN REVIEW |
| 10/14/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/01/2024 | REQUIRES RESUBMIT |
| 05/19/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 06/04/2026 | APPROVED |
| 04/07/2025 | DEVELOPMENT PACKAGE NEW v.3 | 05/12/2025 | REQUIRES RESUBMIT |
| 11/01/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/14/2025 | REQUIRES RESUBMIT |
| 05/14/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 05/14/2026 | REQUIRES RESUBMIT |
| 08/08/2025 | DEVELOPMENT PACKAGE NEW v.1 | 08/25/2025 | REQUIRES RESUBMIT |
| 05/16/2025 | DEVELOPMENT PACKAGE NEW v.4 | 05/23/2025 | APPROVED |
| 08/27/2025 | DEVELOPMENT PACKAGE NEW v.2 | 09/08/2025 | APPROVED |
| 10/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2025 | APPROVED |
| 09/19/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2025 | APPROVED |
| 01/15/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/29/2026 | APPROVED |
Outstanding Inspections
Permit Status: In Review
Permit Number: TD-DEV-1024-00280
Permite Description: Revision 3
Rev 2 - AVP
Development Package for an FLD subdivision consisting of 129 residential lots & Common Areas "A" (Private Streets), "B-1" thru "B-4" (Functional Open Space, Drainage, Utilities, Landscape) & "C-1" thru "C-4" (Open Space, Utilities)
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2026 | Consultation SITE | N/A | Partial Pass | Discussed curb ramp modifications. Provided COT ramp details. Ramp modifications will occur during construction and will require as-built drawings at the end of construction. |
| 05/22/2026 | N/A | Partial Pass | Subgrade Inspection. Typical roadway section is 2.5 AC over 4" AB. Roadway starting at lot 11 close to the entrance off of Anklam. From road in front of lot 11, continue SW towards Lot 21. From SW corner of Site north to street in front of lot 1. Subgrade is compacted and consistent and is consistent with the grade hubs. It was cut +/- .5" deeper than plan, I discussed this with contractor and he confirmed they would compensate this with thicker AB. Reveals on curbs were correct and consistent. Rick Engineering will need to verify Subgrade and density test results are not ready. Okay to place ABC in this roadway when compaction is at least 95% and Rick Engineering verifies Subgrade as acceptable. Schedule paving inspection when ABC is ready before laying asphalt. |
|
| 06/11/2026 | N/A | Partial Pass | good to pour the sidewalks scuppers on the south end of the property | |
| 07/06/2026 | ENGR - Drainage Structures | N/A | Partial Pass | Type 2 sidewalk scuppers wall inspection. 3 cell scupper from basin C3 under sidewalk to smaller basin to the east. Also 1 single into Basin C3 Southeast of lot 3. Reinforcing correct and good for bond to scupper floor. Forms correct and .5" diamond plate good. Okay to pour these scupper walls. |
| 10/13/2026 | Grading Progress ENGR | N/A | Partial Pass | Subgrade is correct for remainder of streets and parking bays up to ROW on Santiago. Reveals, compaction and depths are correct for 2.5 over 4. Some areas along gutters are deeper but those will be compensated with extra AB. Okay to place AB. Schedule Paving inspection to check ABC when ready. |
| 10/27/2026 | N/A | Partial Pass | Wall waterproofed and backfill occurring. Provide a compaction test after backfill. | |
| 11/06/2026 | For trash and recycling enclosures | N/A | Partial Pass | Okay to grout 2nd lift for all Refuse Enclosures except the one by lot 120 which will be build later. |
| 11/10/2026 | ENGR Paving | N/A | Partial Pass | Streets to be paved already approved. Submit density test results of ABC to the permit. |
Completed Inspections
Permit Status: In Review
Permit Number: TD-DEV-1024-00280
Permit Description: Revision 3
Rev 2 - AVP
Development Package for an FLD subdivision consisting of 129 residential lots & Common Areas "A" (Private Streets), "B-1" thru "B-4" (Functional Open Space, Drainage, Utilities, Landscape) & "C-1" thru "C-4" (Open Space, Utilities)
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 11/06/2025 | NPPO Pre-Construction | Passed |
Scheduled Inspections
Scheduled Inspections - TD-DEV-1024-00280
Status: In Review
Description: Revision 3
Rev 2 - AVP
Development Package for an FLD subdivision consisting of 129 residential lots & Common Areas "A" (Private Streets), "B-1" thru "B-4" (Functional Open Space, Drainage, Utilities, Landscape) & "C-1" thru "C-4" (Open Space, Utilities)
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| SITE - Stormwater Follow-up | Scheduled |
For information about today’s scheduled inspections please refer to the