Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
05/22/2026 Partial Pass Subgrade Inspection. Typical roadway section is 2.5 AC over 4" AB. Roadway starting at lot 11 close to the entrance off of Anklam. From road in front of lot 11, continue SW towards Lot 21. From SW corner of Site north to street in front of lot 1. Subgrade is compacted and consistent and is consistent with the grade hubs. It was cut +/- .5" deeper than plan, I discussed this with contractor and he confirmed they would compensate this with thicker AB. Reveals on curbs were correct and consistent. Rick Engineering will need to verify Subgrade and density test results are not ready. Okay to place ABC in this roadway when compaction is at least 95% and Rick Engineering verifies Subgrade as acceptable.
Schedule paving inspection when ABC is ready before laying asphalt.
06/09/2026 Partial Pass contractor is good to place AB on the south part of the project. Contractor also informed me that they’re going to use 5 1/2 inches of AB due to the rock that’s on the sub grade.
11/07/2025 Partial Pass