Permit Reviews
Permit Number - TD-DEV-1023-00435
Permit Status: Complete
Permit Description: Revision 2 - Restricted Access - New multi-family development.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/27/2023 | DEVELOPMENT PACKAGE NEW v.1 | 12/14/2023 | REQUIRES RESUBMIT |
| 04/01/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 04/16/2025 | APPROVED |
| 06/21/2024 | DEVELOPMENT PACKAGE NEW v.3 | 07/02/2024 | REQUIRES RESUBMIT |
| 03/14/2024 | DEVELOPMENT PACKAGE NEW v.2 | 04/22/2024 | REQUIRES RESUBMIT |
| 07/31/2024 | DEVELOPMENT PACKAGE NEW v.4 | 08/01/2024 | APPROVED |
| 01/27/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/20/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1023-00435
Permite Description: Revision 2 - Restricted Access - New multi-family development.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | ENGR Paving | N/A | Partial Pass | Okay to pave pending Subgrade compaction results. ABC good. After striping complete call in striping inspection. Call in Refuse Enclosure inspection when gates are fixed. |
| 04/25/2025 | For trash and recycling enclosures | N/A | Partial Pass | Rebar placement has been corrected, ready for block. |
| 08/19/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to finish placing the DG in back of the apartments. Also needs to remove all the dead wiring. It’s coming up from the ground. Remove the fence that’s in the front and the construction side that did the front and separate one from phase 2 with fencing. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1023-00435
Permit Description: Revision 2 - Restricted Access - New multi-family development.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | For the contractor to call in every two weeks for swap inspections, and for the trash enclosure footer and rebar layout also inform the contractor he track out rock on the Westgate. | |
| 07/11/2025 | Passed | North screen wall at street. | ||
| 08/19/2025 | For trash and recycling enclosures | Passed | ||
| 08/19/2025 | Passed | |||
| 08/21/2025 | Consultation SITE | Passed | The contractor he needed to to remove the fence in the front, clean the whole area, remove his construction trailer and all construction materials and equipment | |
| 09/02/2025 | LAND Landscape Appearance & Function Final | Passed | ||
| 09/02/2025 | Passed | |||
| 09/02/2025 | COT - ENGR - Signage Final | Passed | ||
| 09/04/2025 | ENGR Engineering Final | Passed |