Permit: TD-DEV-1023-00423
Permit Details
Apply Date:
10/13/2023
Applicant:
Alan Lessenden
Description:
Restricted Access - Development Package for new TPD Annex facility. Site design including grading and drainage design, paving plan, and on-site utilities.
Permit Reviews
Permit Number - TD-DEV-1023-00423
Permit Status: Inspections
Permit Description: Restricted Access - Development Package for new TPD Annex facility. Site design including grading and drainage design, paving plan, and on-site utilities.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/16/2024 | DEVELOPMENT PACKAGE NEW v.3 | 10/11/2024 | APPROVED |
05/31/2024 | DEVELOPMENT PACKAGE NEW v.2 | 07/26/2024 | REQUIRES RESUBMIT |
10/16/2023 | DEVELOPMENT PACKAGE NEW v.1 | 12/18/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-1023-00423
Permit Status: Inspections
Permit Description: Restricted Access - Development Package for new TPD Annex facility. Site design including grading and drainage design, paving plan, and on-site utilities.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
10/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
10/11/2024 | Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's) |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-1023-00423
Permit Description: Restricted Access - Development Package for new TPD Annex facility. Site design including grading and drainage design, paving plan, and on-site utilities.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/27/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Went over all paperwork (3rd party inspection) that will be required to be on site. Went over what will be required to be inspected and what civil does inspect. | |
01/27/2025 | NPPO Pre-Construction | Passed |