Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Paving
Permit Number - TD-DEV-1023-00423
Inspection Description - ENGR Paving
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2025 | ENGR Paving | Partial Pass | 9/30/25 - Sub-grade compaction and slopes are accurate to specs. Okay to lay AB. | |
| 12/04/2025 | ENGR Paving | Partial Pass | AB placement: Compaction tests is good, slopes are good, main driveway is good. Parking area on West of building is low, currently being reworked to facilitate 3" AC. Area in front of dumpster enclosure is high, needs to facilitate 4" AC. Recall inspection prior to pave date to confirm corrections. | |
| 12/08/2025 | ENGR Paving | Partial Pass | AB placement is good throughout. Okay to pave. Tack coat needs refreshed prior to paving. | |
| 12/09/2025 | ENGR Paving | Partial Pass | Day 1 of 2 for paving. First lift through drive lane is complete. Second lift and parking stalls will be done tomorrow. | |
| 12/10/2025 | ENGR Paving | Partial Pass | Day 2 of paving, second lift in drive line and parking stalls. Finished elevation and slopes are coming out okay. |