Inspection Status: Passed
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2026 |
Consultation SITE |
|
Passed |
Site visit to assess readiness for final inspections. Site is complete and ready for finals. |
| 08/07/2025 |
Consultation SITE |
|
Passed |
I spoke to the contractor with some changes that need to be made. Contractor needs to get a hold of the engineering record to make those changes and submit them into the City Of Tucson. |
| 08/18/2025 |
Consultation SITE |
|
Passed |
This inspection was to review sidewalks and basins. Their engineer is now responsible to insure the sidewalk can be removed and we will need a revised drawing showing that revision. |
| 12/19/2025 |
Consultation SITE |
|
Partial Pass |
Items required before Engineering Final: Finish Landscaping and irrigation system, complete site fence, install drive-gate openers. |