Permit Details

Status:
Inspections
Type:
Development Package
Address:
6675 S 12TH AV
Address NEW:
6675 S 12TH AV
Apply Date:
09/29/2024
Applicant:
Alex Pillion
Description:
RESTRICED ACCESS 84-Unit Multifamily Development

Permit Reviews

Permit Number - TD-DEV-0924-00273
Permit Status: Inspections
Permit Description: RESTRICED ACCESS 84-Unit Multifamily Development
Start Date Submittal Complete Date Status  
09/30/2024 DEVELOPMENT PACKAGE NEW v.1 10/30/2024 REQUIRES RESUBMIT Review Details
12/12/2024 DEVELOPMENT PACKAGE NEW v.3 12/19/2024 APPROVED Review Details
05/13/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 05/19/2025 APPROVED Review Details
11/19/2024 DEVELOPMENT PACKAGE NEW v.2 12/03/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0924-00273
Permit Status: Inspections
Permit Description: RESTRICED ACCESS 84-Unit Multifamily Development
Total Outstanding Activity Conditions - 1
Date Name
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0924-00273
Permite Description: RESTRICED ACCESS 84-Unit Multifamily Development
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/10/2025 SITE - Stormwater Follow-up N/A Complete (Recurring) There is no concerns at this time
07/10/2025 N/A Partial Pass contractor installed 30 inch HDP 70 feet two barrels good to backfill
07/15/2025 ENGR - Drainage Structures N/A Partial Pass 07/15/25, south east side drainage structure, standards have been met, rebar placement and forms pass, good to pour.
11/06/2025 For trash and recycling enclosures N/A Partial Pass 11/6/26
Ok to grout second lift of refuse enclosures. Request inspections for refuge enclosure when rebar for floor and bollard footers are ready.

Protect all storm drain inlets on site with waddle or other bmp. Use correct concrete cleanout, as well....And as part of the renewed 2025 GCP, the site plan needs to show the entire area including the leased lot for material lay down parking etc.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0924-00273
Permit Description: RESTRICED ACCESS 84-Unit Multifamily Development
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/16/2025 PDSD Engineering Division Pre-Construction SITE Passed
05/30/2025 SITE - Stormwater Setup and Controls Passed On our first by-weekly we will need to see the rain gauge, report book and full set of SWPPP plans. Start your schedule from this date for your by-weekly inspections.
09/24/2025 Consultation SITE Passed For the contractor, we didn’t look at TEP’s lines. But we will inspect the church once it gets onto private property.

Documents

File Name Document Type  
1-5551 - DEVELOPMENT PACKAGE - 2024_09_28_V1.PDF DOCUMENTS VIEW
1-5551 - DRAINAGE REPORT-DR01_V1.PDF DOCUMENTS VIEW
1-5551 - GEOTECH EVALUATION REPORT - 29-224084-0_V1.PDF DOCUMENTS VIEW
1-5551 - TITLE COMMITMENT 24-1011C RINCON MANOR_V1.PDF DOCUMENTS VIEW
2-5551 - DP RESPONSE LETTER 1ST_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TD-DEV-0924-00273 STAMPED 04-24-25.PDF DOCUMENTS VIEW