Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | Partial Pass | Contractor can pour for the curb and gutter on the north side of the project about 200 lineal feet of it. Curb and gutter. |