Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | ENGR - Drainage Structures | Not Ready | contractor called in the wrong inspection needed to call her for the grading inspection, which he did | |
| 06/26/2025 | ENGR - Drainage Structures | Partial Pass | 06/26/25, PAG standard 7 barrel structure. 06/26/25, west side structure, All standards have been met, rebar placement and forms comply with the PAG drawing. |
|
| 07/15/2025 | ENGR - Drainage Structures | Partial Pass | 07/15/25, south east side drainage structure, standards have been met, rebar placement and forms pass, good to pour. |